Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 398
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Testing Painted Components Total results: 6
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 12 of 12 results
-
What is the research workshop that National Institutes of Health (NIH) and the national academies are planning in East Palestine and the greater community?
NIH is putting plans in place to work with the National Academies of Sciences, Engineering, and Medicine to hold a workshop. The purpose of the workshop is to explore potential research priorities to understand the short- and longterm health impacts of the Norfolk Southern Train Derailment. The workshop will be…
- Last published:
-
If a certified inspector or risk assessor determines that a component was installed post-1978 and is therefore free of lead-based paint, can the renovation firm rely on this determination?
Yes, as long as the renovation firm has obtained a copy of the determination. The firm must retain a copy of the determination for three years after completion of the renovation. Question Number: 23002-18218 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
This opportunity does not include Focus Area 1, AOC/Toxics. Many AOC may have underserved community populations. Does EPA have guidelines for how to operate in AOCs without causing duplication interference in that program?
The principal recipient may fund subaward projects within AOCs, provided the primary focus of the project meets the eligibility requirements. EPA will work closely with selected principal recipients as part of our substantial involvement to ensure there is adequate coordination with state and federal AOC programs.
- Last published:
-
Is a lead-based paint inspection sufficient to determine compliance with requirements of the RRP rule?
Question: Is a lead-based paint inspection, performed by a certified inspector or risk assessor, that includes a written determination that various building components are free of paint or other surface coatings containing lead equal to or in excess of 1.0 milligrams per square centimeter (mg/cm2) or 0.5% by weight sufficient…
- Last published:
-
When testing a property for the presence of lead prior to beginning a renovation using an EPA-recognized lead test kit, must I test every component affected by the renovation?
Answer: Yes. Because certified renovator training does not cover sampling protocols, certified renovators using EPA-recognized lead test kits or performing paint chip sampling to determine the applicability of the RRP Rule must test each and every component that will be affected in order to determine that the RRP Rule does…
- Last published:
-
Why are street cleaners no longer watering Taggart the same way they used to?
Street cleaners now lightly mist Taggart with water before using a vacuum truck to collect material from the road. Crews adopted this approach to keep sediment and dust out of the storm drains and Sulphur Run.
- Last published:
-
I am an owner/agent for an apartment community built prior to 1978. In 2004, testing of a random sample of units were negative for lead paint but positive for lead dust. With the positive lead dust result, are we required to comply with the RRP Rule?
No. As long as the determination that the units are free of lead-based paint was made by an inspector or risk assessor certified by EPA or by an authorized State or Tribal program, renovations in the building are not covered by the Lead Renovation, Repair, and Painting (RRP) Rule…
- Last published:
-
If a property is tested by a certified renovator, inspector, or risk assessor and found to be free of lead-based paint, does any testing need to be done again if work is done on the property several years later?
Where a certified renovator uses an EPA-recognized lead test kit or performs paint chip sampling to determine that a component is free of lead-based paint, or a lead-based paint free determination is made by a certified inspector or risk assessor, firms performing renovations on the same components may rely on…
- Last published:
-
Will cleaning the creeks be the last action taken at Sulphur Run and Leslie Run?
EPA’s Order requires detailed identification (characterization) of contamination in Sulphur Run and Leslie Run. The stream characterization will include surface water and sediment testing for contaminants of concern including vinyl chloride and butyl acrylate. This stream characterization will find any areas of remaining contamination and inform the next steps for…
- Last published:
-
Is it required that the principal recipient conduct a competitive RFP process upon award of the GLRI grant?
Establishing the Project RFA is a key element of the GLEJGP. All subawards to Project Subrecipients must be awarded using a fair and transparent process evaluating the following: An evaluation of any possible Project Subrecipient's entity’s abilities to carry-out the project and sustain expected outcomes after the initial project period…
- Last published:
-
If a state does not have any federal or state recognized tribal lands, can PR applicants include outreach projects in similar communities that are not formally recognized? Does the screening need to rely on tools of economic factors?
Applicants do not need to rely solely on EJ Screen or the Climate and Economic Justice Screening Tool to justify inclusion of communities that may not be formal recognized. If applicants can make the case for why these communities are underserved and have needs that could be met through this…
- Last published:
-
I’m a certified renovator using an EPA-recognized lead test kit to determine whether or not I have to follow the Lead Renovation Repair and Painting (RRP) Rule lead-safe work practices. What components must test negative for lead-based paint in order to qualify for the exclusion in 40 CFR 745.82(a)(2)?
Generally, a certified renovator using an EPA-recognized lead test kit must test each building component to be disturbed. The only exception to this requirement is when the components make up an integrated whole. In such a case, one or more component(s) may represent a system of components, unless it is…
- Last published: