Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Waste disposal and containment Total results: 13
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.7 General Requirements Total results: 17
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 16 - 30 of 30 results
-
Can qualified facilities also use the alternative requirements for qualified oil-filled operational equipment?
Yes. Facilities that meet the criteria for qualified facilities and qualified oil-filled operational equipment may benefit from both of the alternative approaches. Since an impracticability determination is not necessary for qualified oil-filled operational equipment, the owner/operator can self-certify the SPCC Plan and is not required to have a PE develop…
- Last published:
-
How is wastewater being collected at the derailment site?
EPA is ensuring that water coming into contact with the derailment site does not runoff into the surrounding area. Wastewater is generated after rain falls on a contaminated area, and from cleaning and washing trucks before they leave the derailment site. Wastewater is collected with pumps and pipes, and temporarily…
- Last published:
-
Is there a temporary water treatment system being installed on the site?
Norfolk Southern has brought in water treatment equipment and made a request to EPA and Ohio EPA to approve a plan for on-site treatment of water that came into contact with contaminated areas. Currently, this water is treated as hazardous waste because it has come into contact with site contamination…
- Last published:
-
Secondary containment calculations in SPCC Plan
The SPCC regulations in 40 CFR §112.7(c) require facilities to provide appropriate containment or diversionary structures or equipment to prevent discharges as described in §112.1(b). Does a facility's SPCC Plan have to include calculations to demonstrate compliance with the §112.7(c) general secondary containment requirements? EPA does not require facilities to…
- Last published:
-
What are the specifications for bulk storage secondary containment systems?
For purposes of the SPCC requirements, "secondary containment for bulk storage facilities must be constructed to at least provide for the capacity of the largest single tank with sufficient freeboard for precipitation. EPA believes that the proper standard of "sufficient freeboard" to contain precipitation is that amount necessary to contain…
- Last published:
-
What are the amended requirements for oil-filled operational equipment?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
Inspection or monitoring program requirements when using alternative secondary containment for oil-filled operational equipment
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
Where are trucks supposed to drive near the derailment site?
Trucks leaving or entering the site have an approved route. Currently, trucks can travel along East Taggart, North Pleasant, and East Martin. As truck traffic increases, you may notice more trucks along East Martin Street. Also, not all trucks are transporting contaminated material. Some trucks also carry clean material to…
- Last published:
-
How is solid waste stored on-site before disposal?
After excavation, solid waste removed from the site is temporarily staged in piles. These piles are securely covered with thick tarps. Liners are also installed below the piles, to help protect the ground underneath them. Berms are also in place to ensure rainwater that falls on the piles is collected…
- Last published:
-
Can a containment wall be constructed out of concrete blocks?
Yes. SPCC regulations do not mandate design specifications, rather, they are performance based. Therefore, a containment wall may be of any construction type, material, or design, assuming it meets the performance standards and requirements of Part 112. Regional offices can help determine whether individual containment equipment meets the performance standards…
- Last published:
-
Qualifying criterion for qualified oil-filled operational equipment
What is the qualifying criterion for the option for qualified oil-filled operational equipment? Equipment is eligible if the facility did not discharge from any oil-filled operational equipment (1) more than 1,000 U.S. gallons of oil in a single discharge to navigable waters, or (2) discharge more than 42 U.S. gallons…
- Last published:
-
Are facilities required to use the option for qualified oil-filled operational equipment?
No. This is an alternative way to comply with the SPCC requirements. An owner or operator can choose to comply with the general requirements to provide secondary containment for each piece of oil-filled operational equipment.
- Last published:
-
What is included in the written commitment of resources?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
Secondary containment for each container under SPCC
Pursuant to 40 CFR §112.7(c) , facilities subject to the Spill Prevention, Control, and Countermeasure (SPCC) must provide containment or diversionary structures or equipment to prevent discharges as described in §112.1(b) . Additionally, facilities must construct all bulk storage container installations (except mobile refuelers) to provide a secondary means of…
- Last published:
-
When could active containment measures be appropriate for mobile refuelers?
Active containment measures require deployment or other specific action by the owner or operator. For discharges that occur only during manned activities, such as transfers, an active measure may be appropriate, as long as the measure can contain the volume and rate of oil, is properly constructed, and is deployed…