EPA Interim Remedial Measure
Interim Measure Work Plan documents.
For more information, see Amphenol/Franklin Power Products in Franklin, Ind.
- Amphenol April 2019 Sewer Remedy Design X-Sections (pdf)
- EPA Approval of the Perimeter and Work Area Air Monitoring Work Plan (pdf)
- EPA Conditional Approval of the Off-Site Interim Measure Work Plan (pdf)
- Amphenol Off-Site Interim Measure Work Plan and Response to Comments (pdf)
- EPA Approval Work Plan for Soil Sampling for Remedial Design (pdf)
- Design-Level Data Soil Investigation Work Plan (pdf)
- Request for Interim Measure Work Plan (pdf)