Project Title | Project Description | Date Completed | Targeted BUI(s) |
---|---|---|---|
Bell Creek Park Wetlands | This project will result in the creation of wetlands in a floodplain lawn area of the park, reconnect separated wetlands and create/ restore 9.0 acres of habitat. | Ongoing |
|
Colonial & Venoy Restoration | This project will improve habitat in Colonial Park and Venoy Dorsey Park by creating 14.5 acres of habitats. | Ongoing |
|
Johnson Intercounty Drain Restoration | The result of this project will improve bank stabilization along the Drain using native trees, shrubs, and grasses, and provide shade for along 3.0 miles of channel and 6 acres upland. | Ongoing |
|
Lola Valley Park Wetlands |
In the floodplain lawn area of the park the result of this project will restore/create 13 acres of habitat in the form of wet meadows and prairie. |
Ongoing |
|
Lower Rouge River Habitat Restoration | This project will result in the removal of 10 existing log jams and problematic instream debris. It will also improve 80 acres of forest habitat. | Ongoing |
|
LTU Wetland Restoration | This project will result in the construction of 1-acre of wetlands and enhanced upland area to improve water flow to wetlands. The result of this project will be the construction of 1-acre of wetlands and enhanced upland area to improve water flow to wetlands. | Ongoing |
|
Nankin Lake Restoration | The result of this project will be the restoration of valuable spawning, nursery, and forage habitat. | Ongoing |
|
Riverview Park Wetlands | This project will result in the restoration/creation of a total of 13 acres of native habitat in the form wet meadows, prairie and riparian habitat. | Ongoing |
|
Rouge Concrete channel restoration | The result of this project will be the evaluation of habitat improvement opportunities along the 4 miles of the channelized cement portion of the Rouge River. | Ongoing |
|
Seeley Creek Restoration | This project will result in the restoration of 5 acres of wetland and 1,600 lft of stream channel, and management of 5 acres for invasive species. | Ongoing |
|
Sherwood Park Wetland | This project will result in the creation/restoration of a total of 7.0 acres of habitat. | Ongoing |
|
Tamarack/Johnson Fish Hatchery Habitat Restoration Implementation | These projects restored 2,850 ft of creek and 3.2 acres of habitat | 2022 |
|
Lower Rouge River – Old Channel Great Lakes Legacy Act project | This project involves installation 3,000 lft of seawall and removal of 70,000 CY of contaminated sediments. | Ongoing |
|
Rouge River - Main Stem Channel Great Lakes Legacy Act project | The result of this project will be further definition of the extent of sediment contamination in the Rouge – Main Stem and determine the amount of sediment that may require remediation as well as feasible and effective remedies for contamination. | Ongoing |
|
Henry Ford Estate Dam Fish Passage and Habitat Restoration | The result of this project will be the reconnection of 50 miles of the Rouge River and 107.5 additional miles of its tributaries to the Great Lakes system. | 2023 (est) |
|
Rouge Oxbow Phase 3 | This project resulted in the creation of the last hydraulic connection and habitat improvements needed to reconnect the Rouge River oxbow to the main flow of the river. | 2020 |
|