Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 398
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- In General Total results: 9
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 13 of 13 results
-
Does the Renovation, Repair, and Painting (RRP) Rule apply to renovations done in an apartment between tenants? Does it matter if children live in other apartments in the building?
Answer: Temporarily unoccupied or vacant rental housing is not exempt from the requirements of the RRP Rule. Question Number: 23002-15669 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
My firm is performing a renovation in an unoccupied home that will be put up for sale when work is done. Does the RRP Rule apply to this renovation?
Yes. Temporarily unoccupied or vacant housing is not exempt from the requirements of the Lead Renovation, Repair, and Painting (RRP) Rule . Question Number: 23002-19754 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
What is the timeline for posting the responses? Will we receive an email with notification on the answers or shall I monitor the website for the posting?
EPA will respond to the individual email 1 - 2 days after receipt and will post the questions and answers to the RFA website very soon thereafter.
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply where no paint at all is present, such as in a 100 year old unfinished basement?
No. The RRP Rule applies to activities that result in the disturbance of painted surfaces. Where there is no paint to disturb, the RRP Rule does not apply. Question Number: 23002-15696 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does the RRP Rule apply to federal employees performing work on federal facilities?
Yes. Federal agencies and their employees must comply with all Federal, State, interstate, and local requirements, both substantive and procedural, respecting lead-based paint in the same manner and to the same extent as any non-governmental entity. In addition, the RRP Rule requires all renovations performed after April 22, 2010, to…
- Last published:
-
Does the RRP rule apply to simple painting activities that occur when rental properties turn over? Approximately half of the rental units in the country get new tenants each year. This means a large number of properties are being repeated.
If there is no surface preparation that disturbs the existing paint prior to painting, the RRP Rule does not apply. If you disturb paint by scraping or sanding while preparing the surface, the RRP Rule applies. Question Number: 23002-15692 Find a printable PDF copy of all frequent questions pertaining to…
- Last published:
-
Does the RRP Rule apply to office buildings, stores, and other commercial buildings?
No, unless the renovation is taking place in a child-occupied facility that is located in a commercial building. “Child-occupied facility’’ means a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within…
- Last published:
-
My firm repairs windows by removing and replacing the sash. We may disturb paint on the hinges and screws, but do not otherwise disturb a painted surface. Is this work subject to the Lead Renovation, Repair and Painting (RRP) Rule?
Replacement of a window sash by simply unscrewing hinges or releasing it from a jambliner does not constitute "window replacement" for purposes of the RRP Rule . Therefore, such tasks may fit within the definition of minor repair and maintenance i.e., activities that disturb six square feet or less of…
- Last published:
-
This opportunity does not include Focus Area 1, AOC/Toxics. Many AOC may have underserved community populations. Does EPA have guidelines for how to operate in AOCs without causing duplication interference in that program?
The principal recipient may fund subaward projects within AOCs, provided the primary focus of the project meets the eligibility requirements. EPA will work closely with selected principal recipients as part of our substantial involvement to ensure there is adequate coordination with state and federal AOC programs.
- Last published:
-
Does the RRP Rule apply to renovations that disturb ceramic tile where the glaze on the tile contains lead at regulated levels?
No. Ceramic tile glaze is neither a surface coating nor a painted surface. Therefore, renovations that disturb ceramic tile glaze are not subject to the RRP Rule. Question Number: 23002-15691 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Is it required that the principal recipient conduct a competitive RFP process upon award of the GLRI grant?
Establishing the Project RFA is a key element of the GLEJGP. All subawards to Project Subrecipients must be awarded using a fair and transparent process evaluating the following: An evaluation of any possible Project Subrecipient's entity’s abilities to carry-out the project and sustain expected outcomes after the initial project period…
- Last published:
-
If a state does not have any federal or state recognized tribal lands, can PR applicants include outreach projects in similar communities that are not formally recognized? Does the screening need to rely on tools of economic factors?
Applicants do not need to rely solely on EJ Screen or the Climate and Economic Justice Screening Tool to justify inclusion of communities that may not be formal recognized. If applicants can make the case for why these communities are underserved and have needs that could be met through this…
- Last published:
-
My firm repairs windows in which the glass has been cracked or broken by removing and replacing the sash. For casement windows, we unscrew and remove the hinges on the old window, pull out the old sash, and install the new sash. For double-hung windows, we release the jambliner, pull out the sash with the damaged glass, and install the new sash. We may disturb paint on the hinges and screws, but do not otherwise disturb a painted surface. Is this work subject to the RRP Rule?
Answer: Replacement of a window sash by simply unscrewing hinges or releasing it from a jambliner does not constitute “window replacement” for purposes of the RRP Rule. Therefore, such tasks may fit within the definition of minor repair and maintenance i.e., activities that disturb six square feet or less of…
- Last published: