Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 398
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Testing for Lead Total results: 19
-
Lead Renovation, Repair and Painting
Total results: 237
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 31 - 45 of 237 results
-
Under the Pre-Renovation Education Rule, I have the option of using a certificate of mailing to notify the owner or occupant. What is the difference between a certificate of mailing and certified mail?
A certificate of mailing is a receipt showing evidence of mailing, while certified mail provides proof of mailing and delivery of mail. When using the certificate of mailing option, no record is kept at the mailing office and a receipt is not obtained when mail is delivered to the addressee…
- Last published:
-
What are the requirements for covering doorways used to access the work area?
Doors used as an entrance to the work area must be covered with plastic sheeting or other impermeable material in a manner that allows workers to pass through while confining dust and debris to the work area. Question Number: 23002-21413 Find a printable PDF copy of all frequent questions pertaining…
- Last published:
-
The certified renovator is required to have proof of their certification at the work site. If the certified renovator provides on-the-job training to workers, does there need to be documentation of that training at the work site too?
Answer: No. Certified renovators must have with them at the work site copies of their initial course completion certificate and their most recent refresher course completion certificate. Certified renovators are also responsible for providing training to non-certified workers on the work practices they will be using in performing their assigned…
- Last published:
-
What is a renovation?
The Lead Renovation, Repair, and Painting (RRP) Rule covers activities that modify an existing structure and that result in the disturbance of painted surfaces. All types of repair, remodeling, maintenance, modernization, and weatherization projects are covered, including projects performed as part of another Federal, State, or local program, if the…
- Last published:
-
To avoid harming the homeowner's grass and landscaping, may my firm fold up the plastic sheeting used for containment at night and re-use it the next day?
Yes, as long as your firm does so in a way that contains any dust and debris on the plastic. One way to accomplish this is to collect and remove the paint chips and debris from the plastic sheeting at the end of each day, mist the sheeting and fold…
- Last published:
-
What training requirements apply to non-certified workers who have previous EPA/HUD lead-safe work practices training or accredited abatement supervisor or worker training?
The Lead Renovation, Repair, and Painting (RRP) Rule requires certified renovators to provide on-the-job training (OJT) to non-certified workers on the work practices they will be using in performing their assigned tasks. The amount of OJT needed and the topics that need to be covered depend on the knowledge and…
- Last published:
-
What mil plastic is considered impermeable?
The regulation does not specify a particular thickness of plastic sheeting considered to be impermeable, but rather includes a performance standard. The performance standard requires firms to isolate the work area, prevent dust and debris from exiting and ensure plastic sheeting is not torn or displaced. Certain guidance materials recommend…
- Last published:
-
What is the definition of a child under 6 years of age?
Answer: A child under six years of age is a child that is less than 72 months old. Question Number: 23002-22691 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
What records will my firm be required to keep to comply with the Renovation, Repair, and Painting Rule?
The following records must be retained for three years following the completion of a renovation: Reports (if any) certifying that lead-based paint is not present; Records relating to the distribution of the lead pamphlet; and Documentation of compliance with the requirements of the regulation ( EPA has prepared a sample…
- Last published:
-
When installing a roof, my firm does not create dust by directly sanding or cutting painted surfaces, but we do hammer the unpainted side of the lumber from above. Does the RRP Rule apply to this work?
The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. If hammering painted components, even on the unpainted side, disturbs paint, creating dust or chips, the RRP Rule applies. Question Number: 23002-23787 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
When must scaffolding and vertical shrouding be used on an exterior renovation when other buildings are in close proximity to the work area?
The certified renovator or a worker under the direction of the certified renovator must contain the work area so that dust or debris does not leave the work area while the renovation is being performed. The certified renovator must be on site while the containment is established and is responsible…
- Last published:
-
When multiple contractors are involved in a single renovation, must every contractor provide pre-renovation education? Can a certified firm assign its responsibility to a property management company?
All firms performing, offering or claiming to perform renovations are responsible for ensuring compliance with the pre-renovation education requirements of the RRP Rule. However, it is unnecessary for the same notifications and information to be given out repeatedly during a single renovation. Accordingly, a firm may discharge the task by…
- Last published:
-
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity?
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity? Do I calculate the amount of painted surface disrupted using the standard for interior renovations (six square feet or…
- Last published:
-
What, if any, additional requirements or liabilities exist if a homeowner independently removes the protective barriers and containment measures implemented by the firm during a renovation?
Before a firm begins a renovation, they are required to comply with all information distribution requirements under the Lead Renovation, Repair and Painting (RRP) Rule and to post signs that clearly define the work area and warn occupants and other persons not involved in renovation activities to remain outside of…
- Last published:
-
Who is responsible for controlling dust and debris from renovation waste once the waste container or truck used to transport the waste leaves the renovation site?
When a renovation firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris. The Lead Renovation, Repair and Painting (RRP) Rule does not address the responsibilities of other entities. EPA recommends consulting with state and local waste disposal authorities to learn…
- Last published: