Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 94
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Minor Repair and Maintenance Activities Total results: 14
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Information for Owners and Managers of Buildings that Contain Asbestos
- Budget
- Minor Repair and Maintenance Activities
Displaying 1 - 15 of 56 results
-
If an Asbestos Hazard Emergency Response Act (AHERA) accredited-training course is taught by someone other than instructors certified by the state or the Environmental Protection Agency (EPA), can an approved contractor/instructor sign certificates?
No. An EPA Asbestos Hazard Emergency Response Act (AHERA) accredited training course must be taught by EPA/state approved instructors and only those approved instructors may issue AHERA approved training course certificates. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings…
- Last published:
-
Is there a formal requirement that an Asbestos Model Accreditation Plan (MAP) asbestos training course must have a training manual?
Accredited trainers are not required to have a formal training manual, per se. According to the Asbestos Model Accreditation Plan (MAP), at Unit III, (A)(3), (A)(4)(d) and (A)(5) of appendix C to 40 CFR part 763, subpart E, a trainer’s application for course approval must include the course curriculum, a…
- Last published:
-
What are the requirements under the Asbestos Hazard Emergency Response Act (AHERA) for refresher training for a person who wants to "step down" his/her certification from contractor/supervisor status to worker status?
If such a person takes contractor/supervisor refresher courses on an annual basis, that person may perform in both the contractor/supervisor and worker roles. If, however, the person chooses only to take annual worker refresher courses, that person may continue to act in the role of an accredited worker but loses…
- Last published:
-
What is the applicability of Federal asbestos inspector accreditation requirements under the Asbestos Hazard Emergency Response Act (AHERA) to real estate appraisers?
Real estate appraisers may not assess the suspected presence, location, or condition of asbestos in a school building or a public and commercial building during an appraisal unless they are accredited pursuant to the Toxic Substances Control Act (TSCA) and the Asbestos Model Accreditation Plan (MAP), as conducting an examination…
- Last published:
-
When would a conflict of interest exist among Asbestos Model Accreditation Plan (MAP)-accredited personnel?
A conflict of interest with respect to Asbestos Model Accreditation Plan (MAP)-accredited personnel would exist if, for example, the management planner and abatement contractor worked for the same firm. The planner might recommend to the LEA more expensive response actions than are necessary in the management plan. Other Frequent Questions…
- Last published:
-
The training requirements specified in 40 CFR part 763 appear to apply to projects (excluding small-scale, short-duration projects) involving interior building components. Specifically, is roofing work and other exterior work covered?
Worker training requirements specified in 40 CFR part 763, including those for accreditation under the Asbestos Model Accreditation Plan (MAP), apply to interior building projects done in schools and public and commercial buildings. Additionally, the asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP), Occupational Safety and Health Administration (OSHA)…
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
How does a company become a provider of Asbestos Model Accreditation Plan (MAP)-accredited asbestos training courses?
Individuals or groups wishing to sponsor training courses for disciplines required to be accredited under section 206(b)(1)(A) of the Toxic Substances Control Act (TSCA) may apply for approval from states that have accreditation program requirements that are at least as stringent as the EPA Asbestos Model Accreditation Plan (MAP). For…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity?
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity? Do I calculate the amount of painted surface disrupted using the standard for interior renovations (six square feet or…
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published: