Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Asbestos and School Buildings Total results: 94
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- After Cleaning Total results: 3
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 46 - 60 of 97 results
-
Is floor tile considered asbestos-containing material (ACM) under the Asbestos Hazard Emergency Response Act (AHERA) if there are contradictory results between polarized-light microscopy (PLM) and transmission electron microscopy?
For its inspection and assessment purposes, the local education agency (LEA) must first rely upon the results analyzed using the 1992 Interim PLM Method found at Appendix A to Subpart E in 40 CFR part 763, unless, it chooses to alternatively rely upon the improved “Test Method for the Determination…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), when acquiring samples of multi-layered material such as wallboard, do you sample both the wallboard and the joint compound as separate materials or can you take a weighted average of both?
As stated in the January 5, 1994 Asbestos Sampling Bulletin clarification, joint compound and wallboard form a “wall system,” and the Environmental Protection Agency (EPA) therefore recommends the use of a composite analysis for this material. See 59 FR 542; see also 60 FR 65243 (1995). For joint compound (not…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), are there any size or volume constraints on the amount of asbestos that can be disturbed or removed during any single small-scale, short-duration project?
Yes, size and volume constraints exist on the amount of asbestos that can be disturbed or removed during any single small-scale, short-duration project. Unit I.A.8 of Appendix C to Subpart E in 40 CFR part 763 provides some useful guidance about how to understand small-scale, short-duration activities. For example, small-scale…
- Last published:
-
Is the school district required to do anything about asbestos in its school buildings?
Yes. The Asbestos Hazard Emergency Response Act (AHERA) was passed by Congress in 1986. AHERA requires public school districts and non-profit private schools to inspect their schools for asbestos-containing building material and prepare management plans which recommend the best way to reduce the hazard from any asbestos-containing materials that may…
- Last published:
-
Is each individual school required to keep a complete updated copy of its asbestos management plan pursuant to the Asbestos Hazard Emergency Response Act (AHERA) in its administrative office?
Yes, each school is required to maintain in its administrative office a complete, updated asbestos management plan for that school. (40 CFR part 763.93(g)(3)). Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from…
- Last published:
-
Was my school required to be inspected for asbestos?
Yes, unless the building architect or project engineer responsible for the construction of the school building certified in writing that no asbestos materials were used in the building’s construction. Otherwise, all public and non-profit private primary and secondary schools need to be inspected for asbestos. The results of the inspections…
- Last published:
-
What are the qualifications or training needed by an individual who teaches the 2-hour asbestos awareness training and the 14-hour additional training for maintenance and/or custodial employees under the asbestos-containing materials in schools rule?
The asbestos-containing materials in schools rule (40 CFR part 763, subpart E) does not require specific qualifications for instructors who perform O&M training. EPA recommends, however, that local education agencies (LEAs) select instructors with a professional or educational background in the asbestos field. Other Frequent Questions about Asbestos Learn About…
- Last published:
-
Several public high school students take advanced placement classes with college freshmen at the State university. Does a classroom or building that these students frequent have to be inspected under the Asbestos Hazard Emergency Response Act (AHERA)?
No. The Asbestos Hazard Emergency Response Act (AHERA) § 203 refers to school buildings under the authority of a local education agency (LEA). State university classrooms are not under an LEA’s authority, and therefore are not covered. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information…
- Last published:
-
How do I find out if my child's school has asbestos in it?
The Asbestos-Containing Materials in Schools Rule, pursuant to the Asbestos Hazard Emergency Response Act (AHERA) requires schools to make their asbestos management plans available to the public, including parents, within 5 working days of the request. The asbestos management plan should discuss the location and type of asbestos-containing materials and…
- Last published:
-
Will samples be collected after cleaning is completed?
Indoor air or surface samples will not be collected as part of this cleaning program. Indoor sampling is not recommended since exposure pathways for volatile organic chemicals (VOCs) have been effectively managed though site engineering controls and an extensive network of air monitoring and sampling equipment. Any VOCs that may…
- Last published:
-
Are churches or sanctuaries that are under the local education agency's (LEA's) authority, which are attended by students for religious worship purposes during normal school hours, required to be inspected?
If the church is not used for school instruction (e.g., math, spelling, etc.) purposes, no. However, when the church is under the authority of an local education agency (LEA) and is used for school instruction it must be inspected and included in the management plan. (Asbestos Hazard Emergency Response Act…
- Last published:
-
Are there criteria under the Asbestos Hazard Emergency Response Act (AHERA) for doing aggressive asbestos air monitoring?
Yes. Unit III.B.7.d. of Appendix A to 40 CFR part 763, subpart E provides criteria for aggressive air monitoring. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings that Contain Asbestos Protect Your Family from Exposures to Asbestos Asbestos Contaminated…
- Last published:
-
Under the Asbestos Hazard Emergency Response Act (AHERA), are five transmission electron microscopy (TEM) outside air samples required to be collected with the five inside and the two blanks if the inside samples and blanks are below 70 structures/mm2?
The five outdoor samples must be collected in addition to the five indoor samples, the two field blanks, and the one sealed blank for a total of thirteen air samples. (40 CFR part 763.90(i)(3)) If the five inside samples are below 70 structures/mm2 and the volume of air used for…
- Last published:
-
A school building includes a covered exterior hallway or walkway. Is this covered exterior hallway or walkway covered by the asbestos-containing materials in schools rule? If so, does this include both the underside and roof of these areas?
Yes. Under 40 CFR part 763.83 of the asbestos-containing materials in schools rule, “school building” is defined to include “[a]ny portico or covered exterior hallway or walkway,” so the covered exterior hallway or walkway is covered. However, only the underside of the hallway or walkway is included; the roof is…
- Last published:
-
If a building is on the premises of a local education agency (LEA) property and under the authority of the LEA, but is being used only as a private residence, is it subject to the Asbestos Hazard Emergency Response Act (AHERA)?
If the residence does not perform any of the functions listed or fall under any of the descriptions given in the definition of a “school building” in AHERA section 202(13) and the asbestos-containing materials in schools rule (40 CFR part 763.83), then it is not subject to AHERA. Other Frequent…
- Last published: