Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Environmental testing results Total results: 8
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Registration Total results: 25
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 49
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Environmental testing results
- Registration
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule
Displaying 1 - 15 of 51 results
-
How can I get help interpreting well sampling results?
Residents requesting Columbiana County water well sample results or assistance interpreting results taken by AECOM or Stantec laboratories can email ( [email protected] ). Additionally, a toxicologist is available to answer questions at 800-222-1222. Columbiana County residents near East Palestine with drinking water wells can request sampling by calling 330-849-3919. Pennsylvania…
- Last published:
-
Is the air monitoring equipment detecting chemicals of concern?
Yes, the air monitoring and sampling equipment are capable of detecting many chemicals of concern in the community and currently detections are below levels of concern. Some of the monitoring equipment may not detect a portion of the chemicals at lower levels–specifically n-butyl acrylate. However, there are independent tools used…
- Last published:
-
Is anybody sampling State Line Lake and the pond near the derailment site?
Norfolk Southern collects daily samples from the surface water near the derailment site, north of the tracks. State Line Lake flows through a wetland area and into the surface water area where the samples are taken. The agencies are reviewing all surface water results and Norfolk’s proposed plan for characterizing…
- Last published:
-
Is it required that the professional engineer conducting the engineering review must be licensed in the state in which the renewable fuel facility is located?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The licensed professional engineer should comply with the state laws where the renewable fuel facility is located to determine whether or not their license allows them to conduct business in that state.
- Last published:
-
May records, regardless of whether they are paper or electronic, be stored off-site?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Refiners, oxygenate blenders and importers must indicate where records will be kept on all facility registrations.(7/1/94) This question and answer was originally posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994…
- Last published:
-
Is the licensed professional engineer conducting the engineering review required to perform the site visit in person, or can they delegate the site visit to another person who maybe assisting them in the engineering review?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1450(b)(2), all verifications must be performed by the licensed professional engineer conducting the engineering review. This requirement includes conducting the site visits. The licensed professional engineer conducting the engineering review must perform the site visits to…
- Last published:
-
In filing company and facility registrations, if a parent corporation has several subsidiary corporations it desires to register and report to EPA under one company ID number, would it be permissible to register all of the facilities operated by the subsi
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In this situation the parent corporation should register for a company ID # and facilities operated by the subsidiary corporations should be registered as separate facilities but under the parent corporation's company ID #.(8/29/94) This question and answer…
- Last published:
-
If my fuel is already registered with the Fuels and Fuel Additives program under 40 CFR Part 79, do I still need to register with the RFS2 program under 40 CFR Part 80?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Even if your fuel or fuel additive is already registered under 40 CFR Part 79, there are additional registration requirements for parties regulated under the RFS2 program, as specified in 40 CFR 80.1450.
- Last published:
-
What is the status of the sampling data from Leslie Run and Sulphur Run?
Sediment sampling in Leslie and Sulphur Run is complete. The data generated by this work are being evaluated and compared to human health and ecological risk threshold criteria. That will lead to a determination about whether additional actions will be required and what those actions should be.
- Last published:
-
Is there one document available that includes the latest version of the Renovation, Repair, and Painting (RRP) Rule, with all amendments added to their associated locations, in complete form, and not including the preamble?
Answer: Yes. Visit the RRP Web site at https://www.epa.gov/lead/answers-frequent-questions-about-epas-lead-renovation-repair-and-painting-rrp-rule Question Number: 23002-19407 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Will insurance premiums go up for contractors covered by the Renovation, Repair, and Painting (RRP) Rule that work in homes and child-occupied facilities with lead-based paint?
The practice of carrying insurance to cover work in older homes from potential lead poisoning damages is not new. The RRP Rule, because it sets a clear standard of care and allows contractors to demonstrate that they meet that standard by taking appropriate training and using proper work practices, could…
- Last published:
-
I am planning to renovate my home. How can I find a lead-safe certified firm?
EPA has a searchable database to help you locate lead-safe certified firms near you at: https://cdxapps.epa.gov/ocspp-oppt-lead/firm-location-search . In addition, you can call EPA's lead hotline at 1-800-424-LEAD (5323) if you have questions. Question Number: 23002-18044 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How much will it cost contractors to comply with the RRP Rule?
Answer: In order to comply with the RRP rule, renovators will incur costs for EPA certification and costs to take a training course from an EPA-accredited training provider, as well as for supplies needed in order to carry out the required lead-safe work practices designed to reduce exposure to lead…
- Last published:
-
How long will it take EPA to process my application to be a lead-safe certified firm?
EPA is required to process your application to be a lead-safe certified firm within 90 days of receipt. In most instances, properly-completed firm applications are processed in about one month. Question Number: 23002-17543 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If there are differences among EPA's, HUD's, and my State's lead-safe work and housing requirements, which ones do I have to comply with?
You must comply with all applicable requirements. The initial 8-hour renovator training course will teach you how to perform lead-safe work practices safely and effectively in compliance with the EPA Lead Renovation, Repair, and Painting (RRP) Rule and the Housing and Urban Development (HUD) Lead Safe Housing Rule. The RRP…
- Last published: