Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Registration Total results: 25
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 49
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Minor Repair and Maintenance Activities Total results: 14
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.7 General Requirements Total results: 17
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 56 results
-
Secondary containment for oil-filled operation equipment under SPCC
On December 26, 2006, EPA provided an optional alternative to the general secondary containment requirements in 40 CFR §112.7(c) for qualified oil-filled operational equipment ( 71 FR 77266 ). Because the alternative is optional, an owner or operator could choose to comply with the existing SPCC requirements to provide general…
- Last published:
-
Is it required that the professional engineer conducting the engineering review must be licensed in the state in which the renewable fuel facility is located?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The licensed professional engineer should comply with the state laws where the renewable fuel facility is located to determine whether or not their license allows them to conduct business in that state.
- Last published:
-
May records, regardless of whether they are paper or electronic, be stored off-site?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Refiners, oxygenate blenders and importers must indicate where records will be kept on all facility registrations.(7/1/94) This question and answer was originally posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994…
- Last published:
-
Is the licensed professional engineer conducting the engineering review required to perform the site visit in person, or can they delegate the site visit to another person who maybe assisting them in the engineering review?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1450(b)(2), all verifications must be performed by the licensed professional engineer conducting the engineering review. This requirement includes conducting the site visits. The licensed professional engineer conducting the engineering review must perform the site visits to…
- Last published:
-
In filing company and facility registrations, if a parent corporation has several subsidiary corporations it desires to register and report to EPA under one company ID number, would it be permissible to register all of the facilities operated by the subsi
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In this situation the parent corporation should register for a company ID # and facilities operated by the subsidiary corporations should be registered as separate facilities but under the parent corporation's company ID #.(8/29/94) This question and answer…
- Last published:
-
If my fuel is already registered with the Fuels and Fuel Additives program under 40 CFR Part 79, do I still need to register with the RFS2 program under 40 CFR Part 80?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Even if your fuel or fuel additive is already registered under 40 CFR Part 79, there are additional registration requirements for parties regulated under the RFS2 program, as specified in 40 CFR 80.1450.
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity?
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity? Do I calculate the amount of painted surface disrupted using the standard for interior renovations (six square feet or…
- Last published:
-
SPCC requirements for transfer areas associated with exempt USTs
Gas stations typically are not subject to the SPCC Rule because completely buried storage tanks subject to 40 CFR Part 280 or 281 are exempt per §112.1(d)(4). However, a gas station would be subject to the SPCC Rule if it has more than 1,320 gallons of oil in aggregate above…
- Last published:
-
Do the changes in the 2006 Amendments apply to oil-filled manufacturing equipment?
No. The amendment does not change any requirements for oil-filled manufacturing equipment. Oil-filled manufacturing equipment remains subject to the SPCC requirements (including those for containment), but an owner/operator may determine that secondary containment is impracticable and comply with the alternative measures in section 112.7(d).
- Last published:
-
What is an oil spill contingency plan?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
Secondary containment requirements for mobile refuelers
What secondary containment requirements apply to mobile refuelers? General secondary containment requirements in §112.7(c) still apply to mobile refuelers at SPCC regulated facilities. General secondary containment should be designed to address the most likely discharge from the container and from oil transfers into or from the mobile refueler. The general…
- Last published:
-
On the registration forms it seems you are forced to check only one primary activity (refiner, oxygenate blender, importer, or independent lab). Do you submit two forms if you are both a refiner and importer?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . No. The final forms have been changed to register each company once for all applicable activities. As before, each facility will be registered separately for each activity that is undertaken at the facility. Import facilities need not be…
- Last published: