Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 94
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Grandfathering Total results: 8
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Information for Owners and Managers of Buildings that Contain Asbestos
- Grandfathering
- Administrative
Displaying 1 - 15 of 56 results
-
If an Asbestos Hazard Emergency Response Act (AHERA) accredited-training course is taught by someone other than instructors certified by the state or the Environmental Protection Agency (EPA), can an approved contractor/instructor sign certificates?
No. An EPA Asbestos Hazard Emergency Response Act (AHERA) accredited training course must be taught by EPA/state approved instructors and only those approved instructors may issue AHERA approved training course certificates. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings…
- Last published:
-
Is there a formal requirement that an Asbestos Model Accreditation Plan (MAP) asbestos training course must have a training manual?
Accredited trainers are not required to have a formal training manual, per se. According to the Asbestos Model Accreditation Plan (MAP), at Unit III, (A)(3), (A)(4)(d) and (A)(5) of appendix C to 40 CFR part 763, subpart E, a trainer’s application for course approval must include the course curriculum, a…
- Last published:
-
What are the requirements under the Asbestos Hazard Emergency Response Act (AHERA) for refresher training for a person who wants to "step down" his/her certification from contractor/supervisor status to worker status?
If such a person takes contractor/supervisor refresher courses on an annual basis, that person may perform in both the contractor/supervisor and worker roles. If, however, the person chooses only to take annual worker refresher courses, that person may continue to act in the role of an accredited worker but loses…
- Last published:
-
What is the applicability of Federal asbestos inspector accreditation requirements under the Asbestos Hazard Emergency Response Act (AHERA) to real estate appraisers?
Real estate appraisers may not assess the suspected presence, location, or condition of asbestos in a school building or a public and commercial building during an appraisal unless they are accredited pursuant to the Toxic Substances Control Act (TSCA) and the Asbestos Model Accreditation Plan (MAP), as conducting an examination…
- Last published:
-
When would a conflict of interest exist among Asbestos Model Accreditation Plan (MAP)-accredited personnel?
A conflict of interest with respect to Asbestos Model Accreditation Plan (MAP)-accredited personnel would exist if, for example, the management planner and abatement contractor worked for the same firm. The planner might recommend to the LEA more expensive response actions than are necessary in the management plan. Other Frequent Questions…
- Last published:
-
The training requirements specified in 40 CFR part 763 appear to apply to projects (excluding small-scale, short-duration projects) involving interior building components. Specifically, is roofing work and other exterior work covered?
Worker training requirements specified in 40 CFR part 763, including those for accreditation under the Asbestos Model Accreditation Plan (MAP), apply to interior building projects done in schools and public and commercial buildings. Additionally, the asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP), Occupational Safety and Health Administration (OSHA)…
- Last published:
-
How will the volume of corn ethanol produced above the grandfathering threshold be treated?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . For grandfathered facilities, only the baseline volumes are exempt from the 20 percent GHG reduction requirement Thus, RINs may be generated for baseline volumes of fuel regardless of lifecycle greenhouse gas emissions performance. Volumes of fuel produced above…
- Last published:
-
Do grandfathered facilities have an additional 6 months to submit their engineering reviews to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. In the preamble to the final RFS2 regulations at 75 Fed. Regs. 14709 (March 26, 2010), EPA stated that, in an effort to reduce demand on engineering resources in the interim between promulgation of the rule and…
- Last published:
-
What is meant by "grandfathered" fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under the RFS2 regulations, renewable fuel produced from facilities that commenced construction before December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction and thereby exempt from the minimum 20% GHG…
- Last published:
-
How long will the grandfathering provision be effective? Once a grandfathered producer registers and completes their engineering review, will their baseline volume ever need to meet the 20% GHG reduction requirement?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If a facility meets the requirements for exemption from the 20% GHG reduction requirement pursuant to 40 CFR 80.1403(c ) or (d), then the baseline volume of renewable fuel produced by that facility is exempt from the 20%…
- Last published:
-
How much flexibility do applicants have in refining the Outcomes and Outcomes over time using an adaptive management approach?
Full Question How much flexibility do applicants have in refining the Outcomes and Outputs identified in their application over time using an adaptive management approach? Answer EPA recognizes that “adaptive management” can be an effective tool in getting the best results. Adjustments to outputs and outcomes based on the adaptive…
- Last published:
-
Do we have to pair hands-on, place-based Great Lakes enviro education with one of the other GLRI actions/related MOP?
Full Question Do we have to pair hands-on, place-based Great Lakes enviro education (i.e., GLRI Measure of Progress, GLRI MOP 5.1.1 youth impacted through education and stewardship projects) with one of the other GLRI actions/related MOP? Answer Projects that relate to 5.1.1 are not required to connect to another specific…
- Last published:
-
Should applications include Outputs and Outcomes related to Project Subrecipient evaluation criteria?
EPA cannot provide a recommendation on this question. Applicants must decide whether or not they develop outputs and outcomes based on Project Subrecipient evaluation criteria for themselves. Please see section I.F. for information on Outcomes, Outputs, and Performance Metrics which includes information on performance measurement and evaluation plans.
- Last published:
-
How does a company become a provider of Asbestos Model Accreditation Plan (MAP)-accredited asbestos training courses?
Individuals or groups wishing to sponsor training courses for disciplines required to be accredited under section 206(b)(1)(A) of the Toxic Substances Control Act (TSCA) may apply for approval from states that have accreditation program requirements that are at least as stringent as the EPA Asbestos Model Accreditation Plan (MAP). For…
- Last published:
-
How do applicants reflect the 6th year of funding on the SF424A form, as there is only room for 5 years?
We realize this is a limitation of the form and expect applicants to provide information to the best of their ability. Applicants should also provide sufficient information in the budget narrative section of their application.
- Last published: