Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Generation of RINs Total results: 6
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 398
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 24 results
-
Can a gallon of ethanol generate more than 1.0 RIN in RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The number of RINs that can be generated for each gallon of renewable fuel are determined by the Equivalence Values. See 80.1415 and 80.1426(f)(2)-(6). Equivalence Values are based on energy content in the renewable fuel in comparison to…
- Last published:
-
If I produce biodiesel using waste vegetable oil, can I generate more RINs per gallon than if I use virgin soy oil? Would the use of solar panels as a heat source for our process help with our RIN number per gallon?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The number of RINs that can be generated for each gallon of renewable fuel is determined by the Equivalence Values. See regulations at 80.1415(b) and 8.1426(f)(2)(i), for example. Equivalence Values are based on energy content in the renewable…
- Last published:
-
Is there one document available that includes the latest version of the Renovation, Repair, and Painting (RRP) Rule, with all amendments added to their associated locations, in complete form, and not including the preamble?
Answer: Yes. Visit the RRP Web site at https://www.epa.gov/lead/answers-frequent-questions-about-epas-lead-renovation-repair-and-painting-rrp-rule Question Number: 23002-19407 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Will insurance premiums go up for contractors covered by the Renovation, Repair, and Painting (RRP) Rule that work in homes and child-occupied facilities with lead-based paint?
The practice of carrying insurance to cover work in older homes from potential lead poisoning damages is not new. The RRP Rule, because it sets a clear standard of care and allows contractors to demonstrate that they meet that standard by taking appropriate training and using proper work practices, could…
- Last published:
-
I am planning to renovate my home. How can I find a lead-safe certified firm?
EPA has a searchable database to help you locate lead-safe certified firms near you at: https://cdxapps.epa.gov/ocspp-oppt-lead/firm-location-search . In addition, you can call EPA's lead hotline at 1-800-424-LEAD (5323) if you have questions. Question Number: 23002-18044 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How much will it cost contractors to comply with the RRP Rule?
Answer: In order to comply with the RRP rule, renovators will incur costs for EPA certification and costs to take a training course from an EPA-accredited training provider, as well as for supplies needed in order to carry out the required lead-safe work practices designed to reduce exposure to lead…
- Last published:
-
How long will it take EPA to process my application to be a lead-safe certified firm?
EPA is required to process your application to be a lead-safe certified firm within 90 days of receipt. In most instances, properly-completed firm applications are processed in about one month. Question Number: 23002-17543 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If there are differences among EPA's, HUD's, and my State's lead-safe work and housing requirements, which ones do I have to comply with?
You must comply with all applicable requirements. The initial 8-hour renovator training course will teach you how to perform lead-safe work practices safely and effectively in compliance with the EPA Lead Renovation, Repair, and Painting (RRP) Rule and the Housing and Urban Development (HUD) Lead Safe Housing Rule. The RRP…
- Last published:
-
What records will my firm be required to keep to comply with the Renovation, Repair, and Painting Rule?
The following records must be retained for three years following the completion of a renovation: Reports (if any) certifying that lead-based paint is not present; Records relating to the distribution of the lead pamphlet; and Documentation of compliance with the requirements of the regulation ( EPA has prepared a sample…
- Last published:
-
What is the operational tolerance for denaturant in ethanol to meet the definition of Renewable Fuel? The RFS2 definition calls for a maximum of 2% denaturant. What if the lab results come back higher or lower than 2%? For example, what if the lab results
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The definition of renewable fuel in 80.1401 specifies that the maximum amount of denaturant in ethanol that can be treated as renewable fuel is 2 volume percent. If lab results indicate that the concentration of denaturant is higher…
- Last published:
-
How can I find a certified renovation firm in my area?
EPA’s website includes a search tool that allows consumers to find certified firms in their area. You can find this search tool at https://cdxapps.epa.gov/ocspp-oppt-lead/firm-location-search . Alternatively, you can contact the National Lead Information Center at 1-800-424-LEAD [5323] for a list of contractors in your area. Question Number: 23002-16209 Find a…
- Last published:
-
Who is covered by the new Renovation, Repair, and Painting (RRP) Rule?
The Renovation, Repair, and Painting (RRP) Rule applies to all firms and individuals who are paid to perform renovation, repair, and painting projects that disturb paint in pre-1978 housing and child-occupied facilities. This includes home improvement contractors, maintenance workers, painters and other specialty trades. Question Number: 23002-24685 Find a printable…
- Last published:
-
My school district will be performing asbestos abatement in a kindergarten classroom that was built before 1978. Do the asbestos abatement workers also need to comply with the RRP rule?
Answer: Yes, if the asbestos abatement disrupts over six square feet of painted surface per room in an interior, or over 20 square feet of painted surface on an exterior, or involves window replacement or demolition of painted surfaces. If so, the asbestos abatement will need to be performed by…
- Last published:
-
If a producer is able to change its D code, can it make retroactive changes in the D code of the RINs it has issued previously during the year or earlier if the production during the previous period would meet the newly classified D code criteria?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Once a RIN is generated and transferred to another party, it cannot be changed. Thus, retroactive changes to D codes in RINs are not allowed.
- Last published:
-
Does ethanol derived from cellulosic feedstock or sugar have the same Equivalence Value as ethanol derived form corn starch, i.e. 1.0?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Equivalence Values are based on energy content in the fuel, adjusted for renewable content in comparison to denatured ethanol. See 80.1415(c). Ethanol from starch, sugar, and cellulose is all chemically identical, and is all 100% renewable (none…
- Last published: