Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 27 results
-
Why Doesn't my Output Vehicle Miles Traveled (VMT) Match my Input VMT?
See More Frequent Questions about MOVES and Related Models . This problem usually occurs when the run specification does not include all possible vehicle and fuel types. MOVES internally allocates the input VMT to each of the source types and fuel types and only reports the VMT for the fuel…
- Last published:
-
How much flexibility do applicants have in refining the Outcomes and Outcomes over time using an adaptive management approach?
Full Question How much flexibility do applicants have in refining the Outcomes and Outputs identified in their application over time using an adaptive management approach? Answer EPA recognizes that “adaptive management” can be an effective tool in getting the best results. Adjustments to outputs and outcomes based on the adaptive…
- Last published:
-
Do we have to pair hands-on, place-based Great Lakes enviro education with one of the other GLRI actions/related MOP?
Full Question Do we have to pair hands-on, place-based Great Lakes enviro education (i.e., GLRI Measure of Progress, GLRI MOP 5.1.1 youth impacted through education and stewardship projects) with one of the other GLRI actions/related MOP? Answer Projects that relate to 5.1.1 are not required to connect to another specific…
- Last published:
-
Should applications include Outputs and Outcomes related to Project Subrecipient evaluation criteria?
EPA cannot provide a recommendation on this question. Applicants must decide whether or not they develop outputs and outcomes based on Project Subrecipient evaluation criteria for themselves. Please see section I.F. for information on Outcomes, Outputs, and Performance Metrics which includes information on performance measurement and evaluation plans.
- Last published:
-
How do applicants reflect the 6th year of funding on the SF424A form, as there is only room for 5 years?
We realize this is a limitation of the form and expect applicants to provide information to the best of their ability. Applicants should also provide sufficient information in the budget narrative section of their application.
- Last published:
-
What does MOVES Assume for Future Year Fleet Fuel Efficiency and Emissions?
See More Frequent Questions about MOVES and Related Models . MOVES reflects all fuel economy and emissions standards that were final as of the model release date. For a list of recent regulations accounted for in the most recent MOVES version, see the see the Overview of EPA’s Motor Vehicle…
- Last published:
-
Why hasn’t the Norwood Landfill Site been identified as a Superfund Site? Two nearby landfills, Folcroft and Clearview, which were established and in use at the same time as Norwood Landfill and Dump have both been designated as Superfund sites.
EPA is still conducting its investigation of the Norwood Landfill Site to determine if it should be placed on the National Priorities List (NPL), or Superfund List. Thus far, the data collected has not demonstrated that the site warrants placement on the NPL. Both the Folcroft and Clearview Landfills went…
- Last published:
-
What is a site assessment and what is the difference between a site assessment and a site investigation?
The first step of the site assessment process is known as a preliminary assessment (PA). This assessment gathers historical and other readily available information on site conditions and surroundings to evaluate whether the site poses a potential threat to human health and the environment and/or whether further investigation is needed…
- Last published:
-
Can letters of support be emailed directly to EPA?
Only materials submitted as part of the grant application submitted on Grants.gov will be considered. If supporters wish to send letters directly to EPA, they may email ( [email protected] ). However, for them to be considered with the application, the applicant organization should be copied on those email messages with…
- Last published:
-
Is it better to not include letters of support from orgs given that they will ultimately be subject to have to apply in a competitive process?
Full Question: The RFA mentions that contractors and subawards must be awarded competitively, however in our niche field and in many of these underserved communities (especially in less urban environments) there may only be 1 or 2 sub-awardees/contractors to work with at all. Should we apply with support listed from…
- Last published:
-
Would it be possible at all to share the list of webinar attendees for coalition-building purposes?
While we encourage applications from coalitions, unfortunately we are not able to facilitate these relationships. EPA will announce the winners of the competition so you would be able to reach out to those winners at that time for subaward or partnership opportunities.
- Last published:
-
Why did EPA wait so long to begin its investigation of the Norwood Landfill and Old Norwood Dump?
In the months leading up to the preliminary assessment, EPA gathered information on the property to determine whether a site investigation under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) was warranted. EPA determined to proceed with an investigation and EPA began procuring contractor services to conduct the preliminary…
- Last published:
-
Why Are There No Emissions for the Early and Late Hours of the Day for Certain Source Types?
See More Frequent Questions about MOVES and Related Models . MOVES has no start emissions for the certain source types in certain hours of the day. While we know that a non-zero number of these source types do start late at night, our activity data on these trucks and buses…
- Last published:
-
Can we refine Project Subrecipient evaluation criteria during the award?
Full question Do we have to include in our application evaluation criteria for: i) the project subrecipient’s ability to carry out the project and sustain expected outcomes after the initial projects person is complete; ii) technical merit and feasibility of their proposed project; iii) and the proposed project’s linkage to…
- Last published:
-
Can we refine MOPs during the award using adaptive management?
Yes. Applicants that choose to utilize an adaptive management approach to revise or refine their anticipated measures of progress should clearly describe the methodology of that approach within their workplan. Such a strategy must be consistent with EPA’s assistance agreement competition policy, specifically such changes must not materially change the…
- Last published: