Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 398
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 15 results
-
Why Doesn't my Output Vehicle Miles Traveled (VMT) Match my Input VMT?
See More Frequent Questions about MOVES and Related Models . This problem usually occurs when the run specification does not include all possible vehicle and fuel types. MOVES internally allocates the input VMT to each of the source types and fuel types and only reports the VMT for the fuel…
- Last published:
-
What does MOVES Assume for Future Year Fleet Fuel Efficiency and Emissions?
See More Frequent Questions about MOVES and Related Models . MOVES reflects all fuel economy and emissions standards that were final as of the model release date. For a list of recent regulations accounted for in the most recent MOVES version, see the see the Overview of EPA’s Motor Vehicle…
- Last published:
-
Who is responsible for controlling dust and debris from renovation waste once the waste container or truck used to transport the waste leaves the renovation site?
When a renovation firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris. The Lead Renovation, Repair and Painting (RRP) Rule does not address the responsibilities of other entities. EPA recommends consulting with state and local waste disposal authorities to learn…
- Last published:
-
For purposes of cleaning the work area following a renovation, is the interior floor of a garage considered interior or exterior space?
In general, the interior floor of a garage is considered an interior space for purposes of post-renovation cleanup. EPA recognizes the fact that it may occasionally be impossible for firms to meet all of the cleaning and verification requirements under the Rule for garage floors such as those that are…
- Last published:
-
If a renovator uses the required practices to remove containment and clean a work area, then performs successful cleaning verification, can the project then be done using uncertified workers and without work practices required by the RRP Rule?
Yes, as long as the balance of the project can be completed without disturbing a painted surface. Question Number: 23002-18385 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How does MOVES Calculate CO2 and CO2 Equivalent Emissions?
See More Frequent Questions about MOVES and Related Models . MOVES calculates the energy it takes to operate an onroad vehicle based on energy consumption rates as explained in the technical reports Greenhouse Gas and Energy Consumption Rates for Onroad Vehicles MOVES3 (pdf) (November 2020, EPA-420-R-20-015) and Exhaust Emission Rates…
- Last published:
-
Why Are There No Emissions for the Early and Late Hours of the Day for Certain Source Types?
See More Frequent Questions about MOVES and Related Models . MOVES has no start emissions for the certain source types in certain hours of the day. While we know that a non-zero number of these source types do start late at night, our activity data on these trucks and buses…
- Last published:
-
My firm is replacing windows on a pre-1978 home. The homeowner already scraped and repainted their house but did not follow lead-safe work practices, leaving paint chips scattered throughout the landscaping. How best should I proceed?
A firm working on a property that is already contaminated with paint chips, dust, debris and residue must proceed by containing the work area for the renovation, and complying with all cleaning requirements under the Lead Renovation, Repair and Painting (RRP) Rule for that work area. Paint chips, dust, debris…
- Last published:
-
Under the RRP Rule, do paint chips and debris need to be removed from protective sheeting even if such chips and debris can be effectively contained by the sheeting or the sealed container the sheeting is contained in for disposal?
Yes. After the renovation has been completed, the firm must clean the work area until no dust, debris, or residue remains. The first cleaning step required by the Lead Renovation, Repair, and Painting (RRP) Rule is to collect all paint chips and debris and, without dispersing any of it, seal…
- Last published:
-
When waste from renovations has been removed from the work area and placed in on-site storage, may the waste be stored in a covered waste container or must it all be bagged for disposal?
Properly implemented, either option can meet the requirements of the Lead Renovation, Repair and Painting (RRP) Rule . At the conclusion of each work day and at the conclusion of the renovation, waste that has been collected from renovation activities must be stored under containment, in an enclosure, or behind…
- Last published:
-
What Pollutants are Included in “oxides of nitrogen” in MOVES?
See More Frequent Questions about MOVES and Related Models . The definition of NOx in MOVES (NO + NO2 + HONO) is different than the standard NOx definition of NOx (NO + NO2). This change has been made to correct the exhaust NOx emission in MOVES for potential interference with…
- Last published:
-
What Drives Seasonal CO Emission Trends?
See More Frequent Questions about MOVES and Related Models . Once a vehicle’s engine/catalyst reaches operating temperature, the ambient temperature has little effect on the emissions performance of the vehicle. These “running” emission rates in MOVES have no temperature adjustment. However, during summer months at warm temperatures, MOVES assumes extensive…
- Last published:
-
Are components removed from the home to be cleaned up and reused subject to the waste handling requirements in the rule?
Answer : While components to be reused rather than disposed of are not considered waste for the purposes of the Lead Renovation, Repair, and Painting (RRP) Rule , it is likely that, even if they do not contain lead-based paint, they are contaminated with dust or debris from the project…
- Last published:
-
The Renovation, Repair, and Painting (RRP) Rule requires HEPA vacuums to be used for cleaning up the dust created by renovations. What should I look for when purchasing a HEPA vacuum?
According to the definition in 40 CFR 745.83 : " HEPA vacuum means a vacuum cleaner which has been designed with a high-efficiency particulate air (HEPA) filter as the last filtration stage. A HEPA filter is a filter that is capable of capturing particulates of 0.3 microns with 99.97% efficiency…
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, is composite sampling acceptable for clearance in lieu of cleaning verification?
Yes. Under the RRP Rule , cleaning verification need not be performed if the contract between the renovation firm and the person contracting for the renovation or another Federal, State, Territorial, Tribal or local law or regulation requires: The renovation firm to perform dust clearance sampling at the conclusion of…
- Last published: