Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 19 results
-
How Can I Reduce the Time Needed to Run the Nonroad Emission Factor Post-Processing Scripts?
See More Frequent Questions about MOVES and Related Models . Very long run times are not unusual for Nonroad emission factor post-processing scripts, particularly with a large output database. To reduce script run time, we recommend doing the following: Reduce the size of your output database by choosing just the…
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
How Do I get Carbon Dioxide Equivalent (CO2e) Results for Nonroad Equipment?
See More Frequent Questions about MOVES and Related Models . CO2e is simply the combination of the pollutants that contribute to climate change adjusted using their global warming potential. This can be done manually summing the mass of the pollutants multiplied by their global warming potential factors. These are the…
- Last published:
-
How Do I Get Emission Factors or Inventory Totals for Nonroad Equipment Aggregated by the Various Categories used by MOVES?
See More Frequent Questions about MOVES and Related Models . We have included a set of post-processing scripts that take the results of a Nonroad run and generate other output options. These scripts are all available in the MOVES graphical user interface in the Post Processing pull-down menu under “Run…
- Last published:
-
Can the application also include program admin support for various coalition partners outside of the principal recipient?
Yes. Coalitions are allowable. Applicants should reflect related admin-related costs in the budget narrative. Please see Question 2 under this section for additional information.
- Last published:
-
How Can I Incorporate Local Data Into My MOVES-Nonroad Run?
See More Frequent Questions about MOVES and Related Models . We recommend not modifying the internal tables of the MOVES-Nonroad model to incorporate local data, as this can lead to unintended consequences. Instead, you can apply local activity and population data by: Executing a nonroad run in Inventory mode for…
- Last published:
-
Can EPA give some clarity on the 6-year timeframe and additional potential years of funding as it relates to project timeline(s)? For example, is the timeframe intended to expect multiple years of RFAs released by the prime under the initial application to the EPA, or one RFA with extended time for project completion and reporting?
The design and overall program approach toward the Project RFA should be decided by the applicant. However, all subawards under the Project RFA must be completed and closed out within the 6-year window.
- Last published:
-
Can N2O (nitrous oxide) Emissions be Estimated in the MOVES Nonroad Model?
See More Frequent Questions about MOVES and Related Models . Nitrous oxide (N2O) results is not an option you can select for nonroad equipment in MOVES.
- Last published:
-
Is the grant reimbursement-based or can money be requested up front incrementally?
The cooperative agreement will be funded incrementally and with the award, there will be an initial increment of funding made available. EPA will be looking to the applicants to budget for that. Applicants will estimate funds needed for that first year and will then work with their assigned EPA project…
- Last published:
-
Funding amounts are for the entire project period and not annually, correct?
Yes, that is correct. Funding amounts are for the entire 6-year period and not annual amounts.
- Last published:
-
Why in my Nonroad Results do I Have a fuelTypeID not Listed in the FuelType Table?
See More Frequent Questions about MOVES and Related Models . The fuel types used by the nonroad part of MOVES is not located in the FuelType table. If you look in the NRFuelType table you will see that 23 is for nonroad diesel fuel and 24 is for marine diesel…
- Last published:
-
How can I Install the NONROAD Model?
See More Frequent Questions about MOVES and Related Models . EPA no longer supports the stand-alone FORTRAN version of the NONROAD model. It likely would need to be recompiled for use in current versions of the Windows operating system. Instead, EPA has included Nonroad equipment estimates in our current MOVES…
- Last published: