Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Pre-Renovation Education Total results: 26
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 16 - 30 of 33 results
-
Does the Renovation, Repair, and Painting (RRP) Rule prohibit the deconstruction and reuse of old building materials containing lead-based paint?
Answer: No. The RRP Rule does not prohibit a firm from extracting, salvaging or reusing building materials that contain lead-based paint. However, the requirements of the RRP Rule may apply to these activities if they (1) occur in target housing or a child-occupied facility, and (2) disturb more than six…
- Last published:
-
My firm performs renovations in large apartment complexes that often consist of several separate buildings. If a renovation is to be performed in a common area in one building, are we required to provide pre-renovation education to all tenants in all buildings?
When renovations are to be performed in common areas of multi-unit target housing, the RRP Rule requires that the firm notify in writing both the owner of the building and each “affected unit.” See 745.84(b)(1) and (2). Common areas are those portions of a property generally accessible to residents/users, and…
- Last published:
-
When a home or an apartment unit is repainted in preparation for a new tenant, is the painting activity always considered a “renovation” for purposes of the pre-renovation education requirements even if no surface preparation activity is performed prior to painting?
Answer: No. The primary determinant of whether a given activity constitutes a “renovation” under the RRP Rule is whether that activity disturbs a painted surface. The practice of recoating painted surfaces in preparation for new tenants would not constitute “renovation” unless accompanied by activities that disturb the painted surface and…
- Last published:
-
Can N2O (nitrous oxide) Emissions be Estimated in the MOVES Nonroad Model?
See More Frequent Questions about MOVES and Related Models . Nitrous oxide (N2O) results is not an option you can select for nonroad equipment in MOVES.
- Last published:
-
How can a firm comply with the pre-renovation education requirements if the owner desires that the renovation begin immediately?
Answer: If the renovation is taking place in an owner-occupied dwelling unit, a firm must simply provide the owner with a copy of the pamphlet, and either (1) obtain, from the owner, a written acknowledgement that the owner has received the pamphlet, or (2) obtain a certificate of mailing at…
- Last published:
-
If a renovation is to be performed on a private balcony of a single unit in a multi-unit target housing building, does that activity trigger the common area notification requirements?
A determination of whether the balcony renovation falls within a common area depends upon the scope of the renovation activity. A common area is a portion of a building that is generally accessible to all residents/users. Thus, if the work area established to contain dust and debris from the renovation…
- Last published:
-
Is an electronic version of the lead information pamphlet sent to the customer via e-mail an acceptable means of distributing the information?
The distribution of the lead information pamphlet (40 CFR § 745.83) via e-mail is an acceptable means of distributing the pamphlet as long as the requirements of the Electronic Signatures in Global and National Commerce Act ("Act") (15 U.S.C. § 7001 et seq.) are met. The Act requires that the…
- Last published:
-
What are the pre-renovation education requirements for a vacant apartment?
Firms performing renovations must provide pre-renovation education to the owner of the unit and to an adult occupant. If the unit is not occupied, providing pre-renovation education to the owner of the unit is sufficient. EPA has prepared a document with additional information . Question Number: 23002-21374 Find a printable…
- Last published:
-
Does a renovator need to attempt personal delivery of the lead information pamphlet to a tenant more than one time before utilizing the “self-certification of pamphlet delivery” option?
Answer: Personal delivery of the lead information pamphlet is preferable, wherever possible, because EPA believes that tenants will be more likely to read the information if it is handed directly to them. It also affords tenants an opportunity to raise concerns and ask questions about the renovation. EPA recognizes, however…
- Last published:
-
The RRP Rule requires delivery of the “Renovate Right” pamphlet to the owner and occupants of target housing. My firm was hired to perform a renovation in a pre-1978 apartment building. Is delivery of the pamphlet to the property manager sufficient for purposes of delivery to the owner of the building?
Answer: Yes. Property managers are acting in the capacity of agents for the building owners. For this reason, a property manager may receive, and acknowledge receipt of, the lead hazard pamphlet on behalf of the owner. In situations where property managers or their employees are performing the renovations themselves, they…
- Last published:
-
Why in my Nonroad Results do I Have a fuelTypeID not Listed in the FuelType Table?
See More Frequent Questions about MOVES and Related Models . The fuel types used by the nonroad part of MOVES is not located in the FuelType table. If you look in the NRFuelType table you will see that 23 is for nonroad diesel fuel and 24 is for marine diesel…
- Last published:
-
How can I Install the NONROAD Model?
See More Frequent Questions about MOVES and Related Models . EPA no longer supports the stand-alone FORTRAN version of the NONROAD model. It likely would need to be recompiled for use in current versions of the Windows operating system. Instead, EPA has included Nonroad equipment estimates in our current MOVES…
- Last published:
-
I am removing aluminum siding from a pre-1978 home. The aluminum siding was nailed over the top of painted wood siding that tested positive for lead. The underlying painted surface is greater than twenty square feet. Must I comply with the Rule when removing the aluminum siding?
Answer: The work practices for exterior projects are based on a performance standard – if the activity disturbs a painted surface (generally, by creating paint chips or dust) in excess of 20 square feet, the work area must be contained so that dust or debris does not leave the work…
- Last published:
-
Can notices for multi-family housing common area renovations be delivered to the mailboxes of dwelling units, or only to the actual units themselves?
Answer: Should a firm decide to comply with the pre-renovation education requirements by hand delivering or mailing “Renovate Right” pamphlets and notices, they may do so either through delivery of the notices directly to tenant units or through delivery to tenant mailboxes. If mailbox delivery is used, both hand delivery…
- Last published:
-
My firm is doing renovations in a school during summer break, and no children under age six will be present during this period. Do we still have to comply with the pre-renovation education requirements? If so, how should the information be distributed?
My firm is going to perform renovations in a school during the students’ summer break. During the regular school year, the work area would fall under the definition of a child-occupied facility. However, no children under age six will be present during this multiple month break period. Do we still…
- Last published: