- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 25 results
-
Secondary containment for oil-filled operation equipment under SPCC
On December 26, 2006, EPA provided an optional alternative to the general secondary containment requirements in 40 CFR §112.7(c) for qualified oil-filled operational equipment ( 71 FR 77266 ). Because the alternative is optional, an owner or operator could choose to comply with the existing SPCC requirements to provide general…
- Last published:
-
SPCC requirements for transfer areas associated with exempt USTs
Gas stations typically are not subject to the SPCC Rule because completely buried storage tanks subject to 40 CFR Part 280 or 281 are exempt per §112.1(d)(4). However, a gas station would be subject to the SPCC Rule if it has more than 1,320 gallons of oil in aggregate above…
- Last published:
-
Do the changes in the 2006 Amendments apply to oil-filled manufacturing equipment?
No. The amendment does not change any requirements for oil-filled manufacturing equipment. Oil-filled manufacturing equipment remains subject to the SPCC requirements (including those for containment), but an owner/operator may determine that secondary containment is impracticable and comply with the alternative measures in section 112.7(d).
- Last published:
-
What is an oil spill contingency plan?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
Secondary containment requirements for mobile refuelers
What secondary containment requirements apply to mobile refuelers? General secondary containment requirements in §112.7(c) still apply to mobile refuelers at SPCC regulated facilities. General secondary containment should be designed to address the most likely discharge from the container and from oil transfers into or from the mobile refueler. The general…
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
Eligibility for qualified oil-filled operational equipment in event of a discharge
Does a facility automatically lose eligibility for the option for qualified oil-filled operational equipment if the equipment has an oil discharge? No. Facilities that choose this alternative and later have a reportable oil discharge from qualified oil-filled operational equipment do not automatically lose eligibility. However, the spill reporting requirements would…
- Last published:
-
Can qualified facilities also use the alternative requirements for qualified oil-filled operational equipment?
Yes. Facilities that meet the criteria for qualified facilities and qualified oil-filled operational equipment may benefit from both of the alternative approaches. Since an impracticability determination is not necessary for qualified oil-filled operational equipment, the owner/operator can self-certify the SPCC Plan and is not required to have a PE develop…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
Secondary containment calculations in SPCC Plan
The SPCC regulations in 40 CFR §112.7(c) require facilities to provide appropriate containment or diversionary structures or equipment to prevent discharges as described in §112.1(b). Does a facility's SPCC Plan have to include calculations to demonstrate compliance with the §112.7(c) general secondary containment requirements? EPA does not require facilities to…
- Last published:
-
What are the specifications for bulk storage secondary containment systems?
For purposes of the SPCC requirements, "secondary containment for bulk storage facilities must be constructed to at least provide for the capacity of the largest single tank with sufficient freeboard for precipitation. EPA believes that the proper standard of "sufficient freeboard" to contain precipitation is that amount necessary to contain…
- Last published:
-
What are the amended requirements for oil-filled operational equipment?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published:
-
PE certifying a technical amendment
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify all technical amendments to an existing SPCC Plan (§112.5(c)). When certifying a technical change to an existing SPCC Plan, does the PE have to inspect and certify the entire Plan or only the amended…
- Last published:
-
Inspection or monitoring program requirements when using alternative secondary containment for oil-filled operational equipment
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection or monitoring program for the equipment to…
- Last published: