Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Registration Total results: 9
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Great Lakes Funding Total results: 49
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Firm Certification Total results: 26
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 43 results
-
In a situation where an importer leases tankage from another company, e.g., from a for-hire terminal, who must register such import facility, the company that owns the terminal, the importer that leases the tankage, or both?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under § 80.2(r), an importer is defined as "a person who imports gasoline or gasoline blending stocks or components from a foreign country into the United States...." Accordingly, it is the importer of the gasoline, and not the…
- Last published:
-
If my fuel is already registered with the Fuels and Fuel Additives program under 40 CFR Part 79, do I still need to register with the RFS2 program under 40 CFR Part 80?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Even if your fuel or fuel additive is already registered under 40 CFR Part 79, there are additional registration requirements for parties regulated under the RFS2 program, as specified in 40 CFR 80.1450.
- Last published:
-
Once I register my fuel for the RFS2 program under §80.1450, do I still need to register my fuel under 40 CFR Part 79?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Renewable fuels intended for use or used in motor vehicles are required to be registered under 40 CFR part 79 prior to any introduction into commerce. Manufacturers of renewable fuels and fuel additives not registered under part…
- Last published:
-
If a company has several legal entities, does each entity have to become a certified firm?
Answer: Yes, if the corporate structure is such that the parent company is not liable for actions of the separate legal entities. Question Number: 23002-18225 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
My non-profit organization applies for and receives grants to renovate older homes. We do not perform the renovations ourselves, we hire renovation contractors to perform them on our behalf. Must my non-profit organization become an RRP-certified firm?
Answer: Yes, even though your organization's employees do not actually perform the renovation activities, your organization must be an RRP-certified renovation firm because your organization, through the grant process, is offering to perform renovations for compensation, i.e., the grant. Question Number: 23002-19775 Find a printable PDF copy of all frequent…
- Last published:
-
I am a facilities manager for a church with daycare and preschool programs. I recently became a certified renovator. If my staff and I do our own painting and remodeling work, do we need to be a certified firm?
Answer: Yes, if you perform, offer, or claim to perform renovations in a portion of the building that is a child-occupied facility. The RRP Rule defines a child-occupied facility as a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under 6 years…
- Last published:
-
If the demolition, cleanup, and cleaning verification portion of a renovation project is performed under the direction of a certified renovator using trained workers, can uncertified workers complete the job if further disturbance of paint will not occur?
If the demolition, cleanup, and cleaning verification portion of a renovation project is performed under the direction of a certified renovator using trained workers, can uncertified workers complete the job if further disturbances of painted surfaces will not occur? For example, a certified firm establishes containment and removes wall and…
- Last published:
-
Must maintenance workers at kindergartens and elementary schools become certified renovators if they perform renovations covered by the RRP Rule? Are the schools or school systems then required to become certified renovation firms?
On or after April 22, 2010, all renovations covered by the Lead Renovation, Repair and Painting (RRP) Rule must be directed by certified renovators and must be performed by certified renovators or individuals trained by a certified renovator. The RRP rule requires any firm, including a local government agency that…
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
Does EPA consider it a conflict of interest for a third-party company to assist a group of renewable fuel producers and importers of renewable fuel to help meet the requirements of the re-registration and engineering review pursuant to section 80.1450?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . EPA does not restrict a renewable fuel producer or an importer of renewable fuel from seeking a third-party company to assist them in meeting the re-registration and engineering review requirements pursuant to section 80.1450. The renewable fuel producer…
- Last published:
-
Will common carriers be required to register their transport trucks as oxygenate blending facilities?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Normally, only the owner of the gasoline produced at an oxygenate blending operation must register as an oxygenate blender. If a common carrier blends gas in trucks that it owns it must meet all of the requirements for…
- Last published:
-
Is the licensed professional engineer conducting the engineering review required to perform the site visit in person, or can they delegate the site visit to another person who maybe assisting them in the engineering review?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1450(b)(2), all verifications must be performed by the licensed professional engineer conducting the engineering review. This requirement includes conducting the site visits. The licensed professional engineer conducting the engineering review must perform the site visits to…
- Last published:
-
Can contractors submit their application to EPA before they complete required training, or must the application be submitted after the training is complete? Is proof of training required by the EPA in order for the contractor's application to be approved?
Answer: The firm certification process does not include the submission of renovator training credentials, so a firm can apply for certification before completing required training. As part of the application, the firm is required to certify it will comply with the requirements of the RRP Rule, including ensuring that all…
- Last published: