Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Taggart Street Reopening Total results: 12
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 23 results
-
Purpose of Oil Pollution Prevention regulation
What is the purpose of the Oil Pollution Prevention regulation? When oil spills into navigable waters or onto adjoining shorelines, it can have harmful impacts on the environment, human health, and economic activity. EPA issued the Oil Pollution Prevention regulation to prevent oil spills and to assure that oil facility…
- Last published:
-
To whom do I report an oil discharge?
A facility should report discharges to the National Response Center (NRC) at 1-800-424-8802 or 1-202-267-2675 . The NRC is the federal government's centralized reporting center, which is staffed 24 hours per day by U.S. Coast Guard personnel. If reporting directly to NRC is not practicable, reports also can be made…
- Last published:
-
When must I report an oil discharge to NRC?
Any person in charge of a vessel or an onshore or offshore facility must notify the National Response Center (NRC) immediately after he or she has knowledge of the discharge.
- Last published:
-
What is the “reduced speed” near work areas? When will the speed limit return to normal?
The reduced speed near work areas on Taggart Street is 15 miles per hour. Be aware that air monitoring vans drive at 10 miles per hour and no passing is permitted. Please obey reduced speed signage to ensure safety of workers and work vehicles. Speed restrictions will continue until final…
- Last published:
-
What hours will truck traffic be present? About how frequent and how long are wait times expected to be?
Most truck traffic on Taggart occurs from 6 a.m. to 6 p.m. Vac trucks and support vehicles will continue to use the street through overnight hours. During traffic interruptions, wait times will likely vary from 15 to 30 minutes and may occur often throughout the day.
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
What happens after a facility submits the information about an oil discharge to EPA?
The EPA Regional Administrator will review the information submitted by the facility and may require a facility to submit and amend its SPCC Plan. Facilities and equipment that qualified for the new streamlined requirements may lose eligibility for those options as determined by the Regional Administrator. A state agency may…
- Last published:
-
Who is subject to the Discharge of Oil regulation?
Any person in charge of a vessel or of an onshore or offshore facility is subject to the reporting requirements of the Discharge of Oil regulation if it discharges a harmful quantity of oil to U.S. navigable waters, adjoining shorelines, or the contiguous zone, or in connection with activities under…
- Last published:
-
Can I get gas at Leake Oil on Taggart Street?
No, Leake Oil is currently closed due to site activities. They have an alternate location on N. Market Street.
- Last published:
-
Reporting requirements for oil discharges
What are the reporting requirements for discharges of oil? If a discharge of oil reaches waters of the United States, it is reportable to the National Response Center under 40 CFR Part 110 , which was established under the authority of the Clean Water Act. Discharges of oil must be…
- Last published:
-
Will air monitoring continue around Taggart Street?
Stationary and mobile air monitoring continues around the community and within the derailment site. As the excavation work is completed and remaining waste removed, air monitoring will be reduced.
- Last published:
-
Can I walk along Taggart Street?
Pedestrians are discouraged from walking on Taggart Street for safety reasons. Heavy equipment and truck traffic are still present, and there are no sidewalks along some stretches of the street.
- Last published:
-
What do I need to submit to EPA if I have an oil discharge?
The owner/operator must provide the following: Name and location of the facility Owner/operator name Maximum storage/handling capacity of the facility and normal daily throughput Corrective actions and countermeasures taken, including descriptions of equipment repairs and replacements Adequate description of the facility, including maps, flow diagrams, and topographical maps, as necessary…
- Last published:
-
What information do I need to report for an oil discharge?
The National Response Center (NRC) will ask a caller to provide as much information about the incident as possible including: • Name, organization, and telephone number • Name and address of the party responsible for the incident • Date and time of the incident • Location of the incident •…
- Last published:
-
How many trucks are still expected throughout the day? What is in the trucks?
Up to 50-100 water, soil, and support vehicles per day are still anticipated as remaining contaminated soil and treated wastewater are shipped off-site. Also, as excavation concludes, trucks will enter the derailment site with clean soil (backfill).
- Last published: