Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 35 results
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
What is the definition of a child under 6 years of age?
Answer: A child under six years of age is a child that is less than 72 months old. Question Number: 23002-22691 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
Can the application also include program admin support for various coalition partners outside of the principal recipient?
Yes. Coalitions are allowable. Applicants should reflect related admin-related costs in the budget narrative. Please see Question 2 under this section for additional information.
- Last published:
-
A child’s consecutive visits to a particular building (such as a hospital) can technically qualify that building as a child-occupied facility, even if the visits were an isolated event. How long does such a building remain a child-occupied facility?
A child’s consecutive visits to a particular building (such as a hospital) can technically qualify that building as a child-occupied facility, even if the visits were an isolated or rare event. How long does such a building remain a child-occupied facility? Answer: A building, or portion of a building, is…
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published:
-
Under FRP, what is the definition of a qualified individual?
The FRP regulations require facilities to prepare an emergency response action plan and identify a qualified individual that has full authority, including contracting authority, to implement removal actions (40 CFR §112.20(h)(i)). What is the definition of a qualified individual? The relevant statute, CWA 311(j)(5)(C)(ii) requires that the plan identify the…
- Last published:
-
Can EPA give some clarity on the 6-year timeframe and additional potential years of funding as it relates to project timeline(s)? For example, is the timeframe intended to expect multiple years of RFAs released by the prime under the initial application to the EPA, or one RFA with extended time for project completion and reporting?
The design and overall program approach toward the Project RFA should be decided by the applicant. However, all subawards under the Project RFA must be completed and closed out within the 6-year window.
- Last published:
-
If a building contains a child-occupied facility, must all renovations in the building follow the Lead Renovation, Repair and Painting (RRP) Rule?
Not necessarily. “Child-occupied facility’’ means a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within any week (Sunday through Saturday period), provided that each day’s visit lasts at least three hours…
- Last published: