Search Frequent Questions
Filter By:
- Permitting Under the Clean Air Act Total results: 13
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Protect Your Family from Exposures to Asbestos Total results: 9
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 94
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Learn About Asbestos Total results: 2
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Permitting Under the Clean Air Act
- Protect Your Family from Exposures to Asbestos
- 40 CFR Part 112.20 Facility Response Plans
Displaying 1 - 15 of 41 results
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
What is the definition of “overburdened community” that is relevant for EPA Actions and Promising Practices?
EPA Actions and Promising Practices apply the description of overburdened communities articulated in EPA’s Plan EJ 2014. The term is used to describe the minority, low‐income, tribal and indigenous populations or communities in the United States that potentially experience disproportionate environmental harms and risks due to exposures or cumulative impacts…
- Last published:
-
My neighbor is re-siding and re-roofing his house and there is material all over the ground. Do I need to be worried about asbestos exposure?
Not all house siding or roofing materials contain asbestos. If you are concerned the material might contain asbestos, you can ask your neighbor whether or not the material has been tested for asbestos. Federal regulations regarding renovations or demolitions of asbestos-containing materials do not apply to a homeowner’s renovation of…
- Last published:
-
How do I know if I have asbestos in my home (in floor tile, ceiling tile, shingles, siding, etc.)?
The only way to be sure whether a material contains asbestos is to have it tested by a qualified laboratory. EPA only recommends testing suspect materials if they are damaged (fraying, crumbling) or if you are planning a renovation that would disturb the suspect material. Samples should be taken by…
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
Are permit applicants required to adopt the Promising Practices?
EPA is not requiring permit applicants to adopt the Promising Practices. Promising Practices are simply that: good ideas in the form of suggestions to permit applicants. Permit applicants may benefit from applying these Promising Practices. EPA hopes that when permit applicants practice early and meaningful dialogue with the community, they…
- Last published:
-
EPA Actions does not require EPA regional offices to prioritize the same types of permits and adopt the same outreach activities. Why doesn’t EPA require regional offices to always prioritize certain permits and always do certain outreach activities?
EPA Actions strikes an important balance between national consistency and regional flexibility. The Agency‐wide guidelines establish national consistency by providing EPA’s expectations for the regional implementation plans. At the same time, EPA recognizes that the regional offices need the flexibility to take actions suited to the types of permits and…
- Last published:
-
Does EPA Actions apply to permits that are jointly issued by EPA and a state, tribal, or local permitting authority with partially delegated permitting authority?
EPA regional offices will decide whether a permit that EPA jointly issues with a state, tribal, or local permitting authority should be considered for prioritization for enhanced outreach as described in EPA Actions on a case‐by‐case basis. EPA will take into account its role and authority in issuing the specific…
- Last published:
-
Why doesn’t EPA do enhanced outreach for every permit?
Robust public outreach and engagement can consume a substantial amount of resources from all stakeholders in a permitting process and would not be warranted for every permit action. EPA recognizes that its regional offices cannot enhance engagement for every EPA‐issued permit and that overburdened communities might be overwhelmed with process…
- Last published:
-
How will an EPA regional office determine whether a permitted activity may have significant public health or environmental impacts?
Permit applications provide information on the proposed project consistent with the requirements of particular statutes and regulations. EPA may also do its own assessment of the environmental and public health impacts of a proposed project, using modeling and monitoring data for example. Such information would inform an EPA regional office’s…
- Last published:
-
How will EPA Actions apply to EPA‐permitted activities that may impact multiple EPA regions?
A permitted activity could potentially impact an area that straddles two or more EPA regions. The EPA region where the permitted activity is located usually has the lead for issuing the permit. EPA regions with the lead for issuing the permit routinely engage other regions impacted by the permitted activity…
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published:
-
Under FRP, what is the definition of a qualified individual?
The FRP regulations require facilities to prepare an emergency response action plan and identify a qualified individual that has full authority, including contracting authority, to implement removal actions (40 CFR §112.20(h)(i)). What is the definition of a qualified individual? The relevant statute, CWA 311(j)(5)(C)(ii) requires that the plan identify the…
- Last published: