Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 19 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
Why is the sentence incomplete on page 34 In the section about collaboration?
Thank you for bringing this to our attention. It appears there was an issue converting the document to a PDF. The missing text will be reflected in a modification to the RFA which will be posted to grants.gov and the EPA's RFA website as soon as possible.
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
Why is Page 34 In the "data interpretation, statistical analysis and report writing, item (3) of effective plans" empty?
Thank you for bringing this to our attention. It appears there was an issue converting the document to a PDF. The missing text will be reflected in a modification to the RFA which will be posted to grants.gov and the EPA's RFA website as soon as possible.
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
Can the application also include program admin support for various coalition partners outside of the principal recipient?
Yes. Coalitions are allowable. Applicants should reflect related admin-related costs in the budget narrative. Please see Question 2 under this section for additional information.
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
Can EPA give some clarity on the 6-year timeframe and additional potential years of funding as it relates to project timeline(s)? For example, is the timeframe intended to expect multiple years of RFAs released by the prime under the initial application to the EPA, or one RFA with extended time for project completion and reporting?
The design and overall program approach toward the Project RFA should be decided by the applicant. However, all subawards under the Project RFA must be completed and closed out within the 6-year window.
- Last published:
-
The authorship of the proposal can be co-written and co-submitted by a coalition. However, how can organizations document the budget? Do coalitions complete several line items budget for each of the members of the coalition and a budget narrative tying them all together? Do coalition members submit one line-item budget and all the coalition members who are not the PR will have a single item listed in the “other” category?
There should be one detailed budget narrative covering the entire project. Whoever is submitting the proposal and responsible for managing the agreement would provide their budget and all the object class categories that you are used too: personal, fringe, travel, equipment, supplies, contracting, and other. The other coalition members, if…
- Last published:
-
PE certification and applying PE's seal
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify a facility’s SPCC Plan. In order to certify an SPCC plan, must a PE apply his seal to the plan, or is the PE’s signature on a certification statement sufficient for SPCC purposes? For…
- Last published:
-
Is the grant reimbursement-based or can money be requested up front incrementally?
The cooperative agreement will be funded incrementally and with the award, there will be an initial increment of funding made available. EPA will be looking to the applicants to budget for that. Applicants will estimate funds needed for that first year and will then work with their assigned EPA project…
- Last published:
-
Is there guidance on how much to ask for if PRs don't use the grant funds and is that an issue?
The expectation is that PRs will have knowledge of the community/communities they are looking to serve and will generally understand the budget required to undertake their proposed project(s). EPA will be funding these cooperative agreements with incremental funding. This means that if a PR comes in for and is awarded…
- Last published:
-
Funding amounts are for the entire project period and not annually, correct?
Yes, that is correct. Funding amounts are for the entire 6-year period and not annual amounts.