Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 33
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Training Provider Accreditation Total results: 7
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- About the Cleaning Process
- Training Provider Accreditation
- 112.3 Requirement to Prepare an SPCC Plan
Displaying 1 - 15 of 20 results
-
How long will it take?
The expectation is for cleaning to take less than one day. The duration will be dependent on the size of the structure and the scope of work.
- Last published:
-
Do I need to leave my structure during the cleaning?
While it is strongly recommended that you leave the property during the cleaning, you are not required to do so.
- Last published:
-
What about cleaning basements or attics?
Basements or attics will be considered for cleaning if they are finished and habitable areas.
- Last published:
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
Will there be photos and videos taken of my property?
Yes, photos and videos of your property will be taken as a requirement of the program. This is done to ensure that the conditions of the property both pre- and post-cleaning are documented thoroughly.
- Last published:
-
Is it permissible for a training provider to employ more than one training manager?
Answer : Yes. The Rule requires that a training provider employ a training manager that meets the qualifications in 40 CFR 745.225(c)(1). EPA does not interpret this to be a limitation on the permissible number of training managers. Therefore, a training provider may employ more than one training manager so…
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
Who will conduct the cleaning?
Cleaning will be performed by workers contracted by Norfolk Southern who are trained and experienced with structure cleaning. Cleaning teams will wear the following: badges, identification clothing, safety vest, shoe covers, gloves (when appropriate for the task), and face coverings (upon request by the property owner or renter).
- Last published:
-
How can we be assured that this cleaning will remove any persistent hazardous material or substances?
Based on air monitoring and sampling conducted in and around the community, there is no evidence to suggest there is contamination of concern inside structures.
- Last published:
-
If a renovator takes the refresher course early, would the new certification be valid for five years from the date of training, or five years from the date that the previous certification expires?
Question : I’m a training provider and have been accredited for the renovator refresher course. If a renovator takes the refresher course early (i.e., before their previous certification has expired), would the new certification be valid for five years from the date of training, or five years from the date…
- Last published:
-
I'm an accredited training provider. Can the final course assessment to be administered in an "open book" format?
No. The training provider is responsible for maintaining the validity and integrity of the course test to ensure that it accurately evaluates the trainee’s knowledge and retention of the course topics. A course test administered in an open book format does not evaluate whether a student has sufficiently learned and…
- Last published:
-
PE certification and applying PE's seal
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify a facility’s SPCC Plan. In order to certify an SPCC plan, must a PE apply his seal to the plan, or is the PE’s signature on a certification statement sufficient for SPCC purposes? For…
- Last published:
-
What will cleaning involve?
Cleaning will include a top-down approach, starting from the top floor and working down, addressing habitable spaces. Workers will wet-wipe accessible horizontal hard surfaces, wet mop hard floors, vacuum floors, carpets and appropriate soft surfaces, and dry dust appropriate vertical surfaces. Cleaning teams will not move appliances, and cleaning under…
- Last published:
-
Was there any consideration for cleaning outside structures or conducting additional residential soil sampling?
Cleaning under this program includes only the inside of structures. Based on soil sampling results from the Phase 1 soil sampling program, additional soil sampling is not necessary. You can find additional information on the EPA website .
- Last published: