Search Frequent Questions
Filter By:
- Permitting Under the Clean Air Act Total results: 13
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Permitting Under the Clean Air Act
- Application of standards
- 112.3 Requirement to Prepare an SPCC Plan
Displaying 1 - 15 of 20 results
-
What is the definition of “overburdened community” that is relevant for EPA Actions and Promising Practices?
EPA Actions and Promising Practices apply the description of overburdened communities articulated in EPA’s Plan EJ 2014. The term is used to describe the minority, low‐income, tribal and indigenous populations or communities in the United States that potentially experience disproportionate environmental harms and risks due to exposures or cumulative impacts…
- Last published:
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
Are permit applicants required to adopt the Promising Practices?
EPA is not requiring permit applicants to adopt the Promising Practices. Promising Practices are simply that: good ideas in the form of suggestions to permit applicants. Permit applicants may benefit from applying these Promising Practices. EPA hopes that when permit applicants practice early and meaningful dialogue with the community, they…
- Last published:
-
EPA Actions does not require EPA regional offices to prioritize the same types of permits and adopt the same outreach activities. Why doesn’t EPA require regional offices to always prioritize certain permits and always do certain outreach activities?
EPA Actions strikes an important balance between national consistency and regional flexibility. The Agency‐wide guidelines establish national consistency by providing EPA’s expectations for the regional implementation plans. At the same time, EPA recognizes that the regional offices need the flexibility to take actions suited to the types of permits and…
- Last published:
-
Does EPA Actions apply to permits that are jointly issued by EPA and a state, tribal, or local permitting authority with partially delegated permitting authority?
EPA regional offices will decide whether a permit that EPA jointly issues with a state, tribal, or local permitting authority should be considered for prioritization for enhanced outreach as described in EPA Actions on a case‐by‐case basis. EPA will take into account its role and authority in issuing the specific…
- Last published:
-
Why doesn’t EPA do enhanced outreach for every permit?
Robust public outreach and engagement can consume a substantial amount of resources from all stakeholders in a permitting process and would not be warranted for every permit action. EPA recognizes that its regional offices cannot enhance engagement for every EPA‐issued permit and that overburdened communities might be overwhelmed with process…
- Last published:
-
How will an EPA regional office determine whether a permitted activity may have significant public health or environmental impacts?
Permit applications provide information on the proposed project consistent with the requirements of particular statutes and regulations. EPA may also do its own assessment of the environmental and public health impacts of a proposed project, using modeling and monitoring data for example. Such information would inform an EPA regional office’s…
- Last published:
-
How will EPA Actions apply to EPA‐permitted activities that may impact multiple EPA regions?
A permitted activity could potentially impact an area that straddles two or more EPA regions. The EPA region where the permitted activity is located usually has the lead for issuing the permit. EPA regions with the lead for issuing the permit routinely engage other regions impacted by the permitted activity…
- Last published:
-
What is the purpose of a cellulosic biofuel waiver credit?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under EISA, EPA is required to make cellulosic biofuel waiver credits available for years where we waive some portion of the statutory volume for cellulosic biofuel. These credits can then be used by obligated parties to comply with…
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
Will EPA provide incentives to permit applicants who adopt Promising Practices, like an expedited permit process?
EPA is not providing incentives to permit applicants who adopt the Promising Practices, such as an expedited permit process. Nevertheless, permit applicants should be aware of the many benefits that can accrue to them if they adopt the Promising Practices to create a constructive dialogue with the community in which…
- Last published:
-
Is fuel sold in U.S. territories, such as Puerto Rico, required to comply with RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . United States territories, such as Puerto Rico, are not included in the RFS2 program unless they opt-in according to §80.1443. See also §§80.1407(f) and 80.1426(b).
- Last published:
-
Could you please expand upon the definition of the cellulosic biofuel waiver credit that may be for sale? I am not certain when, or if, a paper or pulp company could obtain a waiver credit or benefit from selling a waiver credit?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Cellulosic biofuel waiver credits may only be purchased by obligated parties (e.g., gasoline and diesel fuel refiners and importers) from EPA. See section 80.1456(c).
- Last published:
-
PE certification and applying PE's seal
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify a facility’s SPCC Plan. In order to certify an SPCC plan, must a PE apply his seal to the plan, or is the PE’s signature on a certification statement sufficient for SPCC purposes? For…
- Last published:
-
If a permit is prioritized for enhanced outreach, does this mean that EPA will require stricter emission or discharge limits, or deny a permit?
An EPA regional’ office’s decisions on whether to issue a permit and, if so, the conditions to impose within a permit are distinct from the EPA regional office’s decisions about the outreach EPA may perform during the permitting process. EPA’s decisions on whether to issue a permit and what permit…
- Last published: