Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.2 Definitions Total results: 12
- 112.1 Applicability Total results: 18
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 32 results
-
What is a farm for purposes of the SPCC Rule?
In the December 2006 amendments to the SPCC Rule, EPA defined a farm as "a facility on a tract of land devoted to the production of crops or raising of animals, including fish, which produced and sold, or normally would have produced and sold, 1,000 or more of agricultural products…
- Last published:
-
Examples of an agent of a Professional Engineer
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) or an agent of the PE must visit and examine the facility before the PE certifies an SPCC Plan (40 CFR §112.3(d)). What are some examples of an agent of a PE? An agent of a…
- Last published:
-
What is considered bulk oil storage capacity?
The revised rule recognizes that oil is sometimes stored in bulk and sometimes used operationally. A bulk storage container is any container storing oil at a facility. Bulk oil storage containers may include, but are not limited to tanks, containers, drums, and mobile or portable totes. Operational use includes oil-filled…
- Last published:
-
What is the definition of “overburdened community” that is relevant for EPA Actions and Promising Practices?
EPA Actions and Promising Practices apply the description of overburdened communities articulated in EPA’s Plan EJ 2014. The term is used to describe the minority, low‐income, tribal and indigenous populations or communities in the United States that potentially experience disproportionate environmental harms and risks due to exposures or cumulative impacts…
- Last published:
-
Mobile fuel tanker as a facility
Is a non-transportation related mobile fuel tanker with more than 55 gallons located near a 55 gallon drum storage area considered a facility? Perhaps. "Facility" is defined in Part 112 to mean "any mobile or fixed, onshore or offshore building, structure, installation, equipment, pipe, or pipeline (other than a vessel…
- Last published:
-
Do states require extra Tier II information?
Do states require additional information on the Tier II report? How can I find out about the state data requirements? Some states do want additional Tier II information; contact your state Tier II administrator to learn specific details. Tier2 Submit includes fields for the additional information requested or required by…
- Last published:
-
No Street Address Availability Tier II Reporting
Pursuant to 40 CFR 370.42(d) , Tier II chemical inventory information must include the complete name and address of the location of the facility (including the full street address or state road, city, county, State and zip code), latitude and longitude. If a facility does not have a street address…
- Last published:
-
What is a field-constructed container?
What are the types of containers or equipment containing oil reservoirs that would be considered field-constructed containers and thus subject to the brittle fracture evaluation of 40 CFR §112.7(i)? As found in the Preamble language provided on page 47112 of the July 17, 2002 SPCC final rule, EPA provides a…
- Last published:
-
What is oil-filled operational equipment?
Oil-filled operational equipment is equipment that includes an oil storage container (or multiple containers and associated piping intrinsic to the operation of the equipment) in which the oil is present solely to support the function of the apparatus or the device. It is not considered a bulk storage container, and…
- Last published:
-
Are permit applicants required to adopt the Promising Practices?
EPA is not requiring permit applicants to adopt the Promising Practices. Promising Practices are simply that: good ideas in the form of suggestions to permit applicants. Permit applicants may benefit from applying these Promising Practices. EPA hopes that when permit applicants practice early and meaningful dialogue with the community, they…
- Last published:
-
EPA Actions does not require EPA regional offices to prioritize the same types of permits and adopt the same outreach activities. Why doesn’t EPA require regional offices to always prioritize certain permits and always do certain outreach activities?
EPA Actions strikes an important balance between national consistency and regional flexibility. The Agency‐wide guidelines establish national consistency by providing EPA’s expectations for the regional implementation plans. At the same time, EPA recognizes that the regional offices need the flexibility to take actions suited to the types of permits and…
- Last published:
-
Does EPA Actions apply to permits that are jointly issued by EPA and a state, tribal, or local permitting authority with partially delegated permitting authority?
EPA regional offices will decide whether a permit that EPA jointly issues with a state, tribal, or local permitting authority should be considered for prioritization for enhanced outreach as described in EPA Actions on a case‐by‐case basis. EPA will take into account its role and authority in issuing the specific…
- Last published:
-
Why doesn’t EPA do enhanced outreach for every permit?
Robust public outreach and engagement can consume a substantial amount of resources from all stakeholders in a permitting process and would not be warranted for every permit action. EPA recognizes that its regional offices cannot enhance engagement for every EPA‐issued permit and that overburdened communities might be overwhelmed with process…
- Last published:
-
How will an EPA regional office determine whether a permitted activity may have significant public health or environmental impacts?
Permit applications provide information on the proposed project consistent with the requirements of particular statutes and regulations. EPA may also do its own assessment of the environmental and public health impacts of a proposed project, using modeling and monitoring data for example. Such information would inform an EPA regional office’s…
- Last published:
-
How will EPA Actions apply to EPA‐permitted activities that may impact multiple EPA regions?
A permitted activity could potentially impact an area that straddles two or more EPA regions. The EPA region where the permitted activity is located usually has the lead for issuing the permit. EPA regions with the lead for issuing the permit routinely engage other regions impacted by the permitted activity…
- Last published: