Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Residential soil sampling and water testing Total results: 10
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.2 Definitions Total results: 12
- 112.1 Applicability Total results: 18
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Residential soil sampling and water testing
- 40 CFR Part 112.20 Facility Response Plans
- 112.2 Definitions
Displaying 1 - 15 of 41 results
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a farm for purposes of the SPCC Rule?
In the December 2006 amendments to the SPCC Rule, EPA defined a farm as "a facility on a tract of land devoted to the production of crops or raising of animals, including fish, which produced and sold, or normally would have produced and sold, 1,000 or more of agricultural products…
- Last published:
-
Examples of an agent of a Professional Engineer
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) or an agent of the PE must visit and examine the facility before the PE certifies an SPCC Plan (40 CFR §112.3(d)). What are some examples of an agent of a PE? An agent of a…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
What is considered bulk oil storage capacity?
The revised rule recognizes that oil is sometimes stored in bulk and sometimes used operationally. A bulk storage container is any container storing oil at a facility. Bulk oil storage containers may include, but are not limited to tanks, containers, drums, and mobile or portable totes. Operational use includes oil-filled…
- Last published:
-
Where can I find the East Palestine City Park soil sampling results?
You can find East Palestine City Park soil sampling results at: East Palestine City Park soil sampling results
- Last published:
-
Mobile fuel tanker as a facility
Is a non-transportation related mobile fuel tanker with more than 55 gallons located near a 55 gallon drum storage area considered a facility? Perhaps. "Facility" is defined in Part 112 to mean "any mobile or fixed, onshore or offshore building, structure, installation, equipment, pipe, or pipeline (other than a vessel…
- Last published:
-
What were the results from the phase 1 of soil sampling?
Phase 1 of soil sampling is complete, and we have received most of the preliminary data. The vast majority of results are within typical ranges for soil. Samples taken on private properties are all within typical soil levels, and only a few samples taken along public right-of-way (next to roads…
- Last published:
-
What are the next steps?
The sampling data will be evaluated to determine if additional sampling or other action is necessary (additional information will be made available soon). Evaluation of results and future sampling plans will guide EPA’s future work and environmental monitoring in the East Palestine area.
- Last published:
-
What is a field-constructed container?
What are the types of containers or equipment containing oil reservoirs that would be considered field-constructed containers and thus subject to the brittle fracture evaluation of 40 CFR §112.7(i)? As found in the Preamble language provided on page 47112 of the July 17, 2002 SPCC final rule, EPA provides a…
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
What is oil-filled operational equipment?
Oil-filled operational equipment is equipment that includes an oil storage container (or multiple containers and associated piping intrinsic to the operation of the equipment) in which the oil is present solely to support the function of the apparatus or the device. It is not considered a bulk storage container, and…
- Last published:
-
How were soil sample locations chosen?
The study area was determined based on evacuation zones, plume modeling, field observations, and areas most likely to be impacted by the vent and burn. Event Reconstruction Plume Map
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published: