Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Registration Total results: 25
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 49
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
-
Renovations Covered by the RRP Rule
Total results: 84
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
-
Renovations Covered by the RRP Rule
Total results: 84
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Other Risk Management Programs Total results: 35
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 144 results
-
Obtaining an RMP ID Number
How can a facility subject to the Risk Management Plan (RMP) requirements obtain its RMP ID number? The owner or operator of a regulated RMP facility that has already submitted an RMP, may obtain the facility's identification number (RMP ID Number) by contacting the RMP Reporting Center (703-227-7650). An RMP-covered…
- Last published:
-
Does EPA have enforcement authority for the risk management program regulations?
Yes. Under §113 of the CAA, the Agency has the authority to bring administrative and judicial actions against violators. Judicial actions can be civil and criminal in nature. Section 113(a)(3) authorizes the Agency to order violators to comply with the risk management program regulations. Under section 113(b), the Agency may…
- Last published:
-
Criteria for selecting stationary sources to audit
What criteria will be used to select stationary sources for periodic compliance audits of risk management plans (RMPs) submitted under 40 CFR Part 68, Subpart G? The implementing agency will, according to the regulations at 40 CFR §68.220(b), select stationary sources for audits based on any of the following criteria…
- Last published:
-
Is there a citizen suit provision applicable to RMP?
Is there a citizen suit provision applicable to CAA §112 and the risk management program rule? Yes, section 304 of the CAA includes a citizen suit provision for violations of emission standards or limitations promulgated under the Act.
- Last published:
-
How may state and local rules be more stringent?
In what ways may state and local rules be more stringent? Does this document ( General Risk Management Program Guidance ) provide guidance on state and local differences? States and localities may impose more detailed requirements, such as requiring more documentation or more frequent reporting, specifying hours of training or…
- Last published:
-
Is it required that the professional engineer conducting the engineering review must be licensed in the state in which the renewable fuel facility is located?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The licensed professional engineer should comply with the state laws where the renewable fuel facility is located to determine whether or not their license allows them to conduct business in that state.
- Last published:
-
May records, regardless of whether they are paper or electronic, be stored off-site?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Refiners, oxygenate blenders and importers must indicate where records will be kept on all facility registrations.(7/1/94) This question and answer was originally posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994…
- Last published:
-
Is the licensed professional engineer conducting the engineering review required to perform the site visit in person, or can they delegate the site visit to another person who maybe assisting them in the engineering review?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1450(b)(2), all verifications must be performed by the licensed professional engineer conducting the engineering review. This requirement includes conducting the site visits. The licensed professional engineer conducting the engineering review must perform the site visits to…
- Last published:
-
In filing company and facility registrations, if a parent corporation has several subsidiary corporations it desires to register and report to EPA under one company ID number, would it be permissible to register all of the facilities operated by the subsi
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In this situation the parent corporation should register for a company ID # and facilities operated by the subsidiary corporations should be registered as separate facilities but under the parent corporation's company ID #.(8/29/94) This question and answer…
- Last published:
-
If my fuel is already registered with the Fuels and Fuel Additives program under 40 CFR Part 79, do I still need to register with the RFS2 program under 40 CFR Part 80?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Even if your fuel or fuel additive is already registered under 40 CFR Part 79, there are additional registration requirements for parties regulated under the RFS2 program, as specified in 40 CFR 80.1450.
- Last published:
-
A home sustained flooding as a result of a hurricane. Once the flood water recedes, my firm must make the necessary renovations. How do the record keeping requirements apply to an emergency renovation?
Emergency renovations (other than interim controls performed in response to a child with an elevated blood lead level) are exempt from the training, certification, sign posting, waste handling and containment requirements of the Lead Renovation, Repair and Painting (RRP) Rule only to the extent necessary to respond to the emergency…
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply to renovations done in an apartment between tenants? Does it matter if children live in other apartments in the building?
Answer: Temporarily unoccupied or vacant rental housing is not exempt from the requirements of the RRP Rule. Question Number: 23002-15669 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are renovations performed on detached garages, sheds and other detached outbuildings on the property subject to the RRP Rule?
Yes. EPA interprets target housing to include pre-1978 buildings or structures that are (1) located on the residential portion of the property, and (2) associated with the residential use of the property. As a practical matter, the entire property of most urban and suburban residential lots is normally considered to…
- Last published:
-
I have a for-profit business where I purchase residential properties and renovate them. Is this type of renovation work on pre-1978 properties covered by the Lead Renovation, Repair, and Painting (RRP) Rule?
Yes. Individuals who buy, renovate and sell pre-1978 residential properties for a profit (i.e., house flippers) or lease pre-1978 residential properties (i.e., landlords), and do the renovation work themselves, are performing renovations for compensation and are therefore subject to all requirements under the RRP Rule . You must be a…
- Last published: