Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Water Management Update Total results: 9
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Five-Year Accident History Total results: 16
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 36 results
-
Accidental releases from non-covered processes
Should the owner or operator include accidental releases from processes containing listed substances below the threshold quantity in the five-year accident history required under the hazard assessment provisions of 40 CFR Part 68, Subpart B, and in the incident investigation requirements under 40 CFR Part 68, Subparts C and D…
- Last published:
-
Do I have to report accidents that resulted in medical treatment?
I had a release where several people were treated at the hospital and released; they attributed their symptoms to exposure. We do not believe that their symptoms were in fact the result of exposure to the released substance. Do we have to report these as offsite impacts? Yes, you should…
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
What is the definition of "offsite property damage?"
I am working on the five-year accident history portion of the hazard assessment under the RMP. Section 68.42(a) tells me to include "all accidental releases from covered processes that resulted in deaths, injuries, or significant property damage on site, or known offsite deaths, injuries, evacuations, sheltering in place, property damage…
- Last published:
-
When does the accident history's five-year period begin?
The hazard assessment requirements under 40 CFR Part 68, Subpart B include provision of a five-year accident history, as specified at §68.42. When does the five-year period to be reported in the accident history begin? The five-year accident history must include information on all accidental releases from covered processes meeting…
- Last published:
-
What is the definition of injury?
Under the hazard assessment requirements of 40 CFR Part 68, Subpart B, an owner or operator must document a five-year accident history including all accidental releases from covered processes that resulted in deaths, injuries, or significant property damage on site, or known offsite deaths, injuries, evacuations, sheltering in place, property…
- Last published:
-
Do Program Level 1 processes need to do five-year accident histories?
What is the relationship between the accident history criteria for Program 1 and the five-year accident history? If my process is eligible for Program 1, do I still need to do a five-year accident history? The five-year accident history is an information collection requirement that is designed to provide data…
- Last published:
-
Can the application also include program admin support for various coalition partners outside of the principal recipient?
Yes. Coalitions are allowable. Applicants should reflect related admin-related costs in the budget narrative. Please see Question 2 under this section for additional information.
- Last published:
-
Will there be an increase in turbidity (cloudiness or muddiness) or silt in the streams?
The increased flow from this work is expected to be minimal and should not impact turbidity or silt.
- Last published:
-
Will returning the natural flow of water to Sulphur Run disturb areas with sheen?
Conditions in the streams are much improved because of previous cleanup work conducted in 2023. Although oily sheens remain, they are settled in the sediment and do not impact surface water unless disturbed. The increased water flow to Sulphur Run will be minimal and is not expected to disturb sheen…
- Last published:
-
Five-Year Accident History for Non-Gas Releases
Pursuant to 40 CFR §68.42(a), the owner or operator of a stationary source subject to the risk management program regulations must document significant accidental releases of regulated substances from a covered process in the five years prior to the submission of an initial or updated risk management plan (RMP). For…
- Last published:
-
What level of off-site property damage triggers five-year accident history reporting?
What level of off-site property damage triggers reporting? Any level of known offsite property damage triggers inclusion of the accident in the five-year accident history. You are not required to conduct a survey to determine if such damage occurred, but if you know, or could reasonably be expected to know…
- Last published: