Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Environmental Sampling and Monitoring Total results: 7
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Five-Year Accident History Total results: 16
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 36 results
-
What’s the difference between air sampling and air monitoring?
Air monitoring and air sampling are two different methods of looking at air quality. Air monitoring uses electronic devices to provide real-time readings of contaminants in the air. Air sampling involves trapping air over a period of time in a container that is then sent to a laboratory for analysis…
- Last published:
-
Are organizations located outside of the Great Lakes region eligible to apply for this RFA?
Your organization could be eligible. Applicants must meet the eligibility criteria outlined in Section III.A., B., & C. of the RFA in order to apply. Only applications from eligible entities that meet the threshold eligibility requirements will be considered. Applicants should carefully review all threshold eligibility requirements. Applicant eligibility information…
- Last published:
-
Can foreign governments or private entities apply?
No. From page 21 of the RFA: Qualified non-federal entities eligible to apply for grants include non-federal governmental entities: State agencies; any agency or instrumentality of local government; interstate agencies; and federally recognized tribes and tribal organizations. Institutions of Higher Education and non-profit organizations are also eligible to apply. Non-profit…
- Last published:
-
What is EPA’s role in sampling?
EPA is part of the Unified Command consisting of different agencies to review, approve and direct Norfolk Southern’s workplans and site activities. Surface water sampling is performed by Norfolk Southern contractors, with EPA and Ohio EPA oversight. Soil sampling is performed both by Norfolk Southern contractors and EPA contractors. Air…
- Last published:
-
Accidental releases from non-covered processes
Should the owner or operator include accidental releases from processes containing listed substances below the threshold quantity in the five-year accident history required under the hazard assessment provisions of 40 CFR Part 68, Subpart B, and in the incident investigation requirements under 40 CFR Part 68, Subparts C and D…
- Last published:
-
Do I have to report accidents that resulted in medical treatment?
I had a release where several people were treated at the hospital and released; they attributed their symptoms to exposure. We do not believe that their symptoms were in fact the result of exposure to the released substance. Do we have to report these as offsite impacts? Yes, you should…
- Last published:
-
What is the plume map and what does it tell us?
The plume map is an “event reconstruction” based on known weather and on-site observations during a 10-hour time period after the vent-and-burn operation that occurred on Monday, February 6. It tells us where soot likely fell to the ground and where the highest concentrations of particles may be. This information…
- Last published:
-
Applications focused solely on applications on improving access, recreational, and workforce development activities are prohibited, but may a PR propose a project that solely focuses on these activities?
No, subawards focused solely on those things are also not eligible. From page 10: Note: Subawards may also include activities that improve communities’ access and enjoyment of restored areas, provided they are a part of and enhance an eligible project that accomplishes and is directly related to one of the…
- Last published:
-
Would surveying or similar human subject research be allowable as a component of a PG’s application or is any such research expressly prohibited?
Human subjects research and surveys could be eligible activities, provided they are part of a project that otherwise meets the eligibility requirements stated in the RFA. Applicants and potential subawardees should be advised that those activities are subject to the human subjects research and Paperwork Reduction Act review processes, which…
- Last published:
-
Are projects located in Lake Champlain eligible for funding?
Projects located in Lake Champlain are not within the eligible geographic bounds. Proposed GLEJGPs must be implemented within the historic Great Lakes Basin, including projects impacting connecting waterways such as the U.S. portions of the St. Mary’s River, Lake St. Clair and the St. Lawrence River (at or upstream from…
- Last published:
-
Is this grant eligible to all of Ohio or only portions of Ohio within the Great Lake's watershed.
Proposed projects must be implemented within the historic Great Lakes Basin , including projects impacting connecting waterways such as the U.S. portions of the St. Mary’s River, Lake St. Clair and the St. Lawrence River (at or upstream from the point at which the St. Lawrence River becomes the international…
- Last published:
-
What is split sampling?
Split sampling is a technique where multiple samples are collected from the same location at the same time and then sent to separate laboratories for analysis. Checking to see if the labs get the same or similar results is a way to determine the accuracy of the data. If there…
- Last published:
-
What work happens after contamination under and between the train tracks is removed?
After track work is complete, additional cleanup and assessments will continue. This includes shipping solid and liquid wastes off-site, excavating in areas where rail cars were staged and scrapped, and sampling and monitoring groundwater, soil, surface water, and sediment.
- Last published:
-
What is the definition of "offsite property damage?"
I am working on the five-year accident history portion of the hazard assessment under the RMP. Section 68.42(a) tells me to include "all accidental releases from covered processes that resulted in deaths, injuries, or significant property damage on site, or known offsite deaths, injuries, evacuations, sheltering in place, property damage…
- Last published:
-
When does the accident history's five-year period begin?
The hazard assessment requirements under 40 CFR Part 68, Subpart B include provision of a five-year accident history, as specified at §68.42. When does the five-year period to be reported in the accident history begin? The five-year accident history must include information on all accidental releases from covered processes meeting…
- Last published: