Search Frequent Questions
Filter By:
- Coronavirus (COVID-19) Total results: 33
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Plan Preparation and Submission Total results: 49
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 82 results
-
Can I apply a product using a method that is not specified in the directions for use?
List N: Disinfectants for Use Against SARS-CoV-2 View List N, a searchable and sortable list of products for use against SARS-CoV-2, the novel human coronavirus that causes COVID-19. Any time you use an EPA-registered disinfectant, you should read the product label and follow the directions, including the method of application…
- Last published:
-
Change of owner and RMP facility ID number
If a facility is sold to a new owner, does it keep its' original RMP Facility ID number? Yes. The facility will keep the ID number assigned by EPA.
- Last published:
-
Facility ID number and re-registering a facility
If a facility deregisters, then reregisters, should the facility use the original RMP Facility ID or will it be assigned a new ID? The facility should use the original ID assigned by EPA.
- Last published:
-
Resubmission of RMP for a facility that previously deregistered
A covered facility deregisters its RMP because it no longer has more than a threshold quantity of a regulated substance in a covered process. If the facility becomes subject to the CAA §112(r) risk management program regulations at a later date and submits a new RMP, should the facility submit…
- Last published:
-
RMP Records Maintained Onsite
Pursuant to 40 CFR Part 68, Subpart G, the owner or operator of a stationary source subject to the risk management program regulations in Part 68 must develop and submit a risk management plan (RMP). Does the owner or operator have to maintain a written copy of the RMP on…
- Last published:
-
Change of Ownership
If a facility that is subject to the risk management program regulations in 40 CFR Part 68 is sold to another owner, is the facility required to make a correction or a full update of its risk management plan (RMP)? If there are no changes in the covered operations at…
- Last published:
-
Will an Ozone Generator protect me and my family from COVID-19?
No, do not use ozone generators in occupied spaces. When used at concentrations that do not exceed public health standards, ozone applied to indoor air does not effectively remove viruses, bacteria, mold, or other biological pollutants. Visit the Centers for Disease Control and Prevention's website for best practices to protect…
- Last published:
-
RMP*eSubmit preparer access
How does a new Preparer get access to a Risk Management Plan (RMP) via RMP*eSubmit? First, the person must register with CDX. To register with CDX, go to https://cdx.epa.gov/ and complete the registration process for a Risk Management Plan “Preparer”. Once set up as a “Preparer”, the Certifying Official needs…
- Last published:
-
How does EPA verify accuracy and completeness of RMPs?
What does EPA plan to do to verify the accuracy and completeness of submitted Risk Management Plans (RMPs)? All RMPs received by EPA go through an electronic verification process that checks the submission for its completeness. This completeness check determines whether information has been provided for all of the required…
- Last published:
-
Do disinfectants kill newer variants of coronavirus?
List N: Disinfectants for Use Against SARS-CoV-2 View List N, a searchable and sortable list of products for use against SARS-CoV-2, the novel human coronavirus that causes COVID-19. Yes, EPA expects all products on List N to kill all variants of SARS-CoV-2. Genetic changes to the virus do not impact…
- Last published:
-
Can air cleaning devices that use bipolar ionization, including portable air cleaners and in-duct air cleaners used in HVAC systems, protect me from COVID-19?
Bipolar ionization (also called needlepoint bipolar ionization) is a technology that can be used in HVAC systems or portable air cleaners to generate positively and negatively charged particles. Provided manufacturers have data to demonstrate efficacy, manufacturers of these types of devices may market this technology to help remove viruses, including…
- Last published:
-
Will running an evaporative cooler (sometimes known as a "swamp cooler") or whole-house fan help protect me and my family from COVID-19?
Both evaporative coolers (or "swamp coolers") and whole-house fans can help protect people indoors from airborne transmission of COVID-19 because they increase ventilation with outside air to cool indoor spaces. Evaporative coolers are used in dry climates. They use water to provide cooling and increase relative humidity indoors. When operating…
- Last published:
-
Where can professionals who manage school, office, and commercial buildings get information on ventilation and filtration to respond to COVID-19?
Professionals who operate school, office, and commercial buildings should consult the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) guidance for information on ventilation and filtration to help reduce risks from the virus that causes COVID-19. In general, increasing ventilation and filtration is usually appropriate; however, due to the…
- Last published:
-
Five-year Anniversary Due Date and Time
Pursuant to the risk management program regulations in 40 CFR §68.190, the owner or operator of a stationary source shall revise and update the RMP at least once every five years from the date of initial submission. At what time on the 5-year anniversary date is the RMP due? The…
- Last published:
-
Required Contractor Contact Information
A facility that uses a contractor to prepare its RMP must include in the registration section the name, mailing address, and telephone number of the contractor who prepared the RMP (40 CFR §68.160(b)(14)). When a contractor only prepares a portion of an RMP on behalf of a facility, does the…
- Last published: