Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Plan Preparation and Submission Total results: 49
- Program Levels Total results: 16
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Prevention Program Total results: 30
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 65 results
-
Can a facility divide a process when assigning program levels?
My process includes a series of interconnected units, as well as several storage vessels that are co-located. Several sections of the process could qualify for Program 1. Can I divide my process into sections for the purpose of assigning Program levels? No, you cannot subdivide a process for this purpose…
- Last published:
-
If a stationary source has processes ineligible for Program 1, are all processes ineligible?
If a stationary source has several processes that are covered under 40 CFR Part 68, and some of those processes have had an accidental release within the past five years (effectively making those processes ineligible for Program 1 status), are the individual processes from which no accidents have occurred also…
- Last published:
-
Change of owner and RMP facility ID number
If a facility is sold to a new owner, does it keep its' original RMP Facility ID number? Yes. The facility will keep the ID number assigned by EPA.
- Last published:
-
Facility ID number and re-registering a facility
If a facility deregisters, then reregisters, should the facility use the original RMP Facility ID or will it be assigned a new ID? The facility should use the original ID assigned by EPA.
- Last published:
-
Resubmission of RMP for a facility that previously deregistered
A covered facility deregisters its RMP because it no longer has more than a threshold quantity of a regulated substance in a covered process. If the facility becomes subject to the CAA §112(r) risk management program regulations at a later date and submits a new RMP, should the facility submit…
- Last published:
-
If a covered process has an accident, when does it lose eligibility for Program 1 status?
A process covered under 40 CFR Part 68 is eligible for Program 1 requirements if it meets all of the criteria listed at 40 CFR §68.10(b). Those criteria include a requirement that the process cannot have had an accidental release of a regulated substance that led to offsite death, injury…
- Last published:
-
Applicability of program levels and prevention program requirements for co-located vessels
I have a tank with 1,000,000 pounds of toluene diisocyanate (TDI), which is covered under the RMP rule, but not under OSHA PSM. Considered by itself, the TDI would be Program 2 for EPA. The tank, however, is close to equipment that has chlorine above the applicable threshold and is…
- Last published:
-
Changing from a Program 2 or 3 process to a Program 1 process
If five years have passed since the last accident involving a covered process, and that process meets the other two requirements identified under 40 CFR §68.10(b) for Program 1 eligibility, could that process become a Program 1 process even if it had previously been identified as a Program 2 or…
- Last published:
-
RMP Records Maintained Onsite
Pursuant to 40 CFR Part 68, Subpart G, the owner or operator of a stationary source subject to the risk management program regulations in Part 68 must develop and submit a risk management plan (RMP). Does the owner or operator have to maintain a written copy of the RMP on…
- Last published:
-
Change of Ownership
If a facility that is subject to the risk management program regulations in 40 CFR Part 68 is sold to another owner, is the facility required to make a correction or a full update of its risk management plan (RMP)? If there are no changes in the covered operations at…
- Last published:
-
RMP*eSubmit preparer access
How does a new Preparer get access to a Risk Management Plan (RMP) via RMP*eSubmit? First, the person must register with CDX. To register with CDX, go to https://cdx.epa.gov/ and complete the registration process for a Risk Management Plan “Preparer”. Once set up as a “Preparer”, the Certifying Official needs…
- Last published:
-
How does EPA verify accuracy and completeness of RMPs?
What does EPA plan to do to verify the accuracy and completeness of submitted Risk Management Plans (RMPs)? All RMPs received by EPA go through an electronic verification process that checks the submission for its completeness. This completeness check determines whether information has been provided for all of the required…
- Last published:
-
Five-year Anniversary Due Date and Time
Pursuant to the risk management program regulations in 40 CFR §68.190, the owner or operator of a stationary source shall revise and update the RMP at least once every five years from the date of initial submission. At what time on the 5-year anniversary date is the RMP due? The…
- Last published:
-
Required Contractor Contact Information
A facility that uses a contractor to prepare its RMP must include in the registration section the name, mailing address, and telephone number of the contractor who prepared the RMP (40 CFR §68.160(b)(14)). When a contractor only prepares a portion of an RMP on behalf of a facility, does the…
- Last published:
-
If a facility changes owners and significant changes have been made to plant operations is the facility required to update all sections of the RMP and resubmit it to EPA?
Yes. If the facility has new ownership and plant operations have changed significantly, the new facility owner/operator needs to do a resubmission. For details on how to resubmit, see the Web page for RMP*eSubmit .
- Last published: