Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
-
Lead
Total results: 401
- Testing for Lead Total results: 19
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 237
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Prevention Program Total results: 30
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 67 results
-
Hot Work Definition and Requirements
Facilities subject to the Program 3 Prevention Program requirements in 40 CFR Part 68 must include in their Risk Management Plan the date of the most recent review or revision of hot work permit procedures in Section 7.13. What is considered hot work and what are the requirements related to…
- Last published:
-
Do I have to conduct incident investigations of releases resulting from theft?
The incident investigation provisions of 40 CFR Part 68 (§§68.60 and 68.81) require facilities to investigate incidents that resulted in or could reasonably have resulted in a catastrophic release. Are covered facilities required to perform incident investigations of releases resulting from theft of covered substances, such as anhydrous ammonia? If…
- Last published:
-
Do Program 1 processes have to complete a process hazard analysis?
Do owners or operators of Program 1 processes have to complete a process hazard analysis? No. The Program 1 requirements do not include a process hazard analysis (40 CFR §68.12(b)). Program 3 processes require completion of a process hazard analysis (40 CFR §68.12(d)(3)) while Program 2 processes must complete a…
- Last published:
-
Is a hazard review synonymous with a process hazard analysis (PHA)?
The prevention program requirements under 40 CFR Part 68, Subparts C and D, include hazard reviews and process hazard analyses. Is a hazard review synonymous with a process hazard analysis (PHA)? No. A hazard review is different from a PHA. A hazard review is part of the Program 2 prevention…
- Last published:
-
How often must compliance audits be performed?
How often must owners or operators of stationary sources subject to the risk management program regulations perform compliance audits? The regulations at 40 CFR §§68.58(a) and 68.79(a) state that owners or operators must certify that they have evaluated compliance with the applicable prevention program provisions at least once every three…
- Last published:
-
Underground Storage Tanks in SPCC Plans
If a gas station that has less than 42,000 gallons completely buried oil storage capacity and no aboveground oil storage capacity installs a new aboveground tank with a capacity greater than 1,320 gallons, must the facility’s Spill Prevention, Control, and Countermeasure (SPCC) Plan address the underground storage tanks (USTs) in…
- Last published:
-
Container capacity less than 55 gallons
Do facilities need to consider containers that are less than 55 gallons for applicability under 40 CFR Part 112? No. The third column of page 47066 of the July 17, 2002 Preamble states that "You need only count containers of 55 gallons or greater in the calculation of the regulatory…
- Last published:
-
Oil-filled equipment capacity
When counting against the 1,320 aboveground storage capacity threshold, would operational storage of oil (such as in a hydraulic press) be used? Oil which is contained in equipment is required to be factored into the storage capacity for the facility even though the oil may be only used for ancillary…
- Last published:
-
If your farm does not have fuel storage that will flow into US waters by a ditch, river, stream, or lake, do you have to prepare a SPCC Plan?
No. EPA suggests you use a common sense approach. If one of your oil storage tanks leaks, and the spilled oil would not flow into navigable waters or adjoining shorelines, you do not have to prepare a Plan. Remember that you still have the responsibility to clean up any spilled…
- Last published:
-
Ground water pathways related to reasonably expected to discharge
The SPCC Rule applies to facilities that could reasonably be expected to discharge into navigable waters (40 CFR §112.2(a)). Does a facility need to consider ground water pathways when determining if a discharge of oil could reasonably be expected to reach navigable waters? Owners and operators should consider whether on-site…
- Last published:
-
SPCC responsibility for tanks on leased property
What if I leased some parcels, and there are tanks already present? Am I responsible for these tanks? You could be. If you plan to use these tanks, make sure in your lease agreement, it states who is responsible for these tanks. If the lease does not state who is…
- Last published:
-
When testing a work area, does one lead test kit or paint chip sample suffice for any single component?
The certified renovator is only required to use one lead test kit or paint chip sample for each component, even if the surface of the component is extensive (e.g., a large wall). Question Number: 23002-23865 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Can a homeowner use an EPA-recognized lead test kit to check for lead-based paint?
Answer: A number of lead test kits are available for consumer purchase in most retail hardware stores; however, the Consumer Product Safety Commission (CPSC) states that consumers should exercise caution when using these lead test kits to evaluate consumer products for potential lead exposures. Find more information online . To…
- Last published:
-
How can I obtain D-Lead® test kits?
The D-Lead® test kits are available for purchase from certain distributors and retail outlets. Locate a distributor or retailer online , email [email protected] or call 414-962-3006. Question Number: 23002-16390 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Is lead paint testing required under the Lead Renovation, Repair and Painting (RRP) Rule?
No. A firm can either assume lead-based paint is present and follow the requirements of the RRP Rule (which requires no testing), or test and if lead-based paint is found follow the requirements of the regulation. Question Number: 23002-32338 Find a printable PDF copy of all frequent questions pertaining to…
- Last published: