Search Frequent Questions
Filter By:
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Prevention Program Total results: 30
- Program Levels Total results: 16
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 739 results
-
Hot Work Definition and Requirements
Facilities subject to the Program 3 Prevention Program requirements in 40 CFR Part 68 must include in their Risk Management Plan the date of the most recent review or revision of hot work permit procedures in Section 7.13. What is considered hot work and what are the requirements related to…
- Last published:
-
Do I have to conduct incident investigations of releases resulting from theft?
The incident investigation provisions of 40 CFR Part 68 (§§68.60 and 68.81) require facilities to investigate incidents that resulted in or could reasonably have resulted in a catastrophic release. Are covered facilities required to perform incident investigations of releases resulting from theft of covered substances, such as anhydrous ammonia? If…
- Last published:
-
Can a facility divide a process when assigning program levels?
My process includes a series of interconnected units, as well as several storage vessels that are co-located. Several sections of the process could qualify for Program 1. Can I divide my process into sections for the purpose of assigning Program levels? No, you cannot subdivide a process for this purpose…
- Last published:
-
If a stationary source has processes ineligible for Program 1, are all processes ineligible?
If a stationary source has several processes that are covered under 40 CFR Part 68, and some of those processes have had an accidental release within the past five years (effectively making those processes ineligible for Program 1 status), are the individual processes from which no accidents have occurred also…
- Last published:
-
If a covered process has an accident, when does it lose eligibility for Program 1 status?
A process covered under 40 CFR Part 68 is eligible for Program 1 requirements if it meets all of the criteria listed at 40 CFR §68.10(b). Those criteria include a requirement that the process cannot have had an accidental release of a regulated substance that led to offsite death, injury…
- Last published:
-
Do Program 1 processes have to complete a process hazard analysis?
Do owners or operators of Program 1 processes have to complete a process hazard analysis? No. The Program 1 requirements do not include a process hazard analysis (40 CFR §68.12(b)). Program 3 processes require completion of a process hazard analysis (40 CFR §68.12(d)(3)) while Program 2 processes must complete a…
- Last published:
-
Is a hazard review synonymous with a process hazard analysis (PHA)?
The prevention program requirements under 40 CFR Part 68, Subparts C and D, include hazard reviews and process hazard analyses. Is a hazard review synonymous with a process hazard analysis (PHA)? No. A hazard review is different from a PHA. A hazard review is part of the Program 2 prevention…
- Last published:
-
Applicability of program levels and prevention program requirements for co-located vessels
I have a tank with 1,000,000 pounds of toluene diisocyanate (TDI), which is covered under the RMP rule, but not under OSHA PSM. Considered by itself, the TDI would be Program 2 for EPA. The tank, however, is close to equipment that has chlorine above the applicable threshold and is…
- Last published:
-
Changing from a Program 2 or 3 process to a Program 1 process
If five years have passed since the last accident involving a covered process, and that process meets the other two requirements identified under 40 CFR §68.10(b) for Program 1 eligibility, could that process become a Program 1 process even if it had previously been identified as a Program 2 or…
- Last published:
-
How often must compliance audits be performed?
How often must owners or operators of stationary sources subject to the risk management program regulations perform compliance audits? The regulations at 40 CFR §§68.58(a) and 68.79(a) state that owners or operators must certify that they have evaluated compliance with the applicable prevention program provisions at least once every three…
- Last published:
-
If RFG is shipped from a refinery to a terminal through a proprietary pipeline system, may the pipeline rely on the refinery and terminal test results to satisfy the quality assurance defense element?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In a case where EPA documents a downstream standard violation at a proprietary terminal that is served only by a proprietary pipeline that receives gasoline only from a proprietary refinery, the company that owns the refinery, pipeline and…
- Last published:
-
If, due to piping constraints, a refiner must put a purchased or inter-refinery transferred batch of finished gasoline through the refinery blendstock system, but does so without the batch losing integrity, must the refiner include the batch in his compli
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . No. As per § 80.65(i) of the regulations, any refiner, importer, or oxygenate blender shall exclude from all compliance calculations, the volume and properties of any RFG that is produced at another refinery or oxygenate blending facility, or…
- Last published:
-
In areas where an oxy fuels program is in effect, how do these requirements coincide with RFG requirements? In areas where there is an overlap, are any regulatory changes necessary by the state?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In areas that are covered by both a state's winter oxy fuels and the federal RFG programs, the fuel must comply with both program requirements. Therefore, the more stringent 2.7 wt% minimum requirement of the winter oxy fuels…
- Last published:
-
If foreign product is acquired by an importer through an exchange agreement instead of a sale, does it change identification of the importer for RFG reporting purposes?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . No. The person who is the importer of record for Customs purposes should be the importer for RFG purposes, and this is usually the gasoline owner, regardless of how that ownership was acquired.(7/1/94) This question and answer was…
- Last published:
-
If terminals utilize the services of outside laboratories for periodic sampling and testing, how can the terminal limit exposure to liability in the event non-complying product from the tested tank(s) leaves the terminal during the three or four days befo
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . A terminal-distributor's release of RFG that does not meet applicable standards would constitute a violation of § 80.78(a)(1) for which the distributor would be liable, and it would not be a defense if the violation was caused by…
- Last published: