Search Frequent Questions
Filter By:
- Great Lakes Funding Total results: 92
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Applicability/General Duty Clause Total results: 69
- Offsite Consequence Analysis (OCA) Total results: 57
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 218 results
-
Criteria for selecting alternative release scenarios
As part of the hazard assessment, owners and operators of Program 2 and Program 3 covered processes must identify and analyze alternative release scenarios (40 CFR §68.28). What criteria should be used when selecting an alternative release scenario? The owner or operator of a stationary source subject to the risk…
- Last published:
-
Why is the sentence incomplete on page 34 In the section about collaboration?
Thank you for bringing this to our attention. It appears there was an issue converting the document to a PDF. The missing text will be reflected in a modification to the RFA which will be posted to grants.gov and the EPA's RFA website as soon as possible.
- Last published:
-
Are organizations located outside of the Great Lakes region eligible to apply for this RFA?
Your organization could be eligible. Applicants must meet the eligibility criteria outlined in Section III.A., B., & C. of the RFA in order to apply. Only applications from eligible entities that meet the threshold eligibility requirements will be considered. Applicants should carefully review all threshold eligibility requirements. Applicant eligibility information…
- Last published:
-
Can foreign governments or private entities apply?
No. From page 21 of the RFA: Qualified non-federal entities eligible to apply for grants include non-federal governmental entities: State agencies; any agency or instrumentality of local government; interstate agencies; and federally recognized tribes and tribal organizations. Institutions of Higher Education and non-profit organizations are also eligible to apply. Non-profit…
- Last published:
-
Does the distance to endpoint start at the process or stationary source boundary?
When selecting the worst-case release scenario for Program 2 and 3 processes as required by 40 CFR §68.25, a stationary source owner or operator must analyze the release scenario that results in the greatest distance to an endpoint. Does the "greatest distance to an endpoint" refer to the greatest total…
- Last published:
-
Using meteorological station data for off-site consequence analyses
For the purpose of the offsite consequence analyses required under 40 CFR Part 68, Subpart B, there are several instances in which data gathered at a local meteorological station may be used to establish the modeling parameters of wind speed, atmospheric stability, temperature, and humidity for the stationary source. How…
- Last published:
-
Underground storage tank off-site impacts to groundwater, drinking water, or soil
For the worst-case and alternative release scenarios of an underground storage tank, should I consider any impact on groundwater, drinking water, or soil? No. As part of the worst-case and alternative release scenarios, you need to define the offsite impacts to the environment (40 CFR §68.33) by listing the environmental…
- Last published:
-
Why are industries exempt under OSHA's PSM subject to RMP?
The Program 3 prevention program requirements under 40 CFR Part 68 are almost identical to the requirements of OSHA's process safety management (PSM) standard. OSHA exempts certain industries from the PSM standard. Why does EPA not exempt those same industries from the CAA §112(r) risk management program requirements? EPA and…
- Last published:
-
What if the quantity in the process fluctuates?
What if the quantity in the process fluctuates? I may not have a threshold quantity now, but I will intermittently exceed the threshold quantity. You do not need to comply with the rule and file an RMP unless you have more than threshold quantity in a process; however, once you…
- Last published:
-
Administrative controls considered when determining worst-case release quantity
For the purpose of analyzing the worst-case release scenario required as part of the hazard assessment at 40 CFR Part 68, Subpart B, the worst-case release quantity is identified as the greatest amount held in a single vessel or pipe, taking into account administrative controls that limit the maximum quantity…
- Last published:
-
Are Mechanical Controls Considered Administrative Controls?
For the purpose of analyzing the worst-case release scenario required as part of the hazard assessment at 40 CFR Part 68, Subpart B, the worst-case release quantity is identified as the greatest amount held in a single vessel or pipe, taking into account administrative controls that limit the maximum quantity…
- Last published:
-
Worst-case release from smaller process with larger distance to endpoint
The owner or operator of a stationary source covered by the risk management program regulations must conduct a worst-case release scenario analysis as part of the required hazard assessment (40 CFR §68.25). The worst-case release is defined as the release of the largest quantity of a regulated substance from a…
- Last published:
-
Process identification and distance between vessels
How far apart do separate vessels have to be to be considered different processes? There is no hard and fast rule for how great this distance should be before you do not need to consider the vessels as part of one process. Two vessels at opposite ends of a large…
- Last published:
-
What does "same industrial group" mean?
Operations at a site that belong to the same three-digit North American Industry Classification System (NAICS) code prefix (which has replaced the old SIC codes) belong to the “same industrial group. In addition, where one or more operations at the site serve primarily as support facilities for the main operation…
- Last published:
-
Updating RMP if EPA lists a new substance
What if EPA lists a new substance? You will have three years from the date on which the new listing is effective to come into compliance for any process that is covered because EPA has listed a new substance.