Search Frequent Questions
Filter By:
- Butte Area/Silver Bow Creek Total results: 17
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Reporting Total results: 22
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 153 results
-
What is a reactive and non-reactive solid EHS?
Reactive solid means any extremely hazardous substance denoted with “a” in the “Notes” column in Appendix A or B of 40 CFR 355. Reactive solids are more likely than other solids to be dispersed into the air due to the energy or heat created from their reactivity with water or…
- Last published:
-
How did states form their SERCs?
How are States expected to form their State Emergency Response Commission (SERC) as required under Title III? States are required to establish a State Emergency Response Commission (SERC) under Title III. The SERC may consist of existing emergency response organizations or may be an entirely new mechanism to address this…
- Last published:
-
Pesticide applicator quantity applied to threshold or transportation exemption
A farmer contracts with an applicator to spray pesticides on his fields. The applicator drives a tank truck onto the farmers' field and sprays the pesticide from the truck onto the fields. For purposes of Section 302 emergency planning requirements, are the EHSs in the truck considered present at the…
- Last published:
-
State refusing to comply with the emergency planning provisions
What will happen if a State refuses to comply with the emergency planning provisions? A governor who does not designate a State emergency response commission becomes the commission by default. While the governor could choose not to fulfill any of the Title III provisions, the public could still request information…
- Last published:
-
Section 302 notification requirements and mixtures with unknown components
Are facilities exempt from Section 302 notification requirements if they produce, use, or store mixtures whose extremely hazardous substance component information is not available on the MSDS provided by the manufacturer? If the facility which produces, uses, or stores mixtures knows or reasonably should know the components of the mixture…
- Last published:
-
Is it required that the professional engineer conducting the engineering review must be licensed in the state in which the renewable fuel facility is located?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The licensed professional engineer should comply with the state laws where the renewable fuel facility is located to determine whether or not their license allows them to conduct business in that state.
- Last published:
-
I have not seen a reference to the EPA CDX system. Is the CDX system already established or can we submit reports in our choice of electronic formats?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The Central Data Exchange (CDX) is an established portal through which electronic data are submitted. All registered parties will have to first register with CDX in order to receive a CDX registration number. More information may be found…
- Last published:
-
May I generate RINs that I produced and sold for non-road use in the past so that I can reinstate those RINs under RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Section 80.1426(c)(2) provides that RINs are assigned to a volume of renewable fuel when ownership of the RIN is transferred along with ownership of the volume of renewable fuel. A comparable provision appear in the RFS1 regulations, at…
- Last published:
-
Do I have to register to use CDX and is this a separate registration process?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . You will have to register with CDX. (Registering with CDX is not the same as registering under regulation Section 80.1150.) Instructions are available via our Reporting for Fuel Programs web site. Question and Answer was originally posted at…
- Last published:
-
How will the volume of corn ethanol produced above the grandfathering threshold be treated?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . For grandfathered facilities, only the baseline volumes are exempt from the 20 percent GHG reduction requirement Thus, RINs may be generated for baseline volumes of fuel regardless of lifecycle greenhouse gas emissions performance. Volumes of fuel produced above…
- Last published:
-
Was Jatropha analyzed for this final rule and, if so, what D-code applies?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The GHG emissions performance of a Jatropha-based pathway was not analyzed for the final rule because sufficient information was not available. Since EPA has not yet assigned a D code for this pathway, a producer cannot generate RINs…
- Last published:
-
Do grandfathered facilities have an additional 6 months to submit their engineering reviews to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. In the preamble to the final RFS2 regulations at 75 Fed. Regs. 14709 (March 26, 2010), EPA stated that, in an effort to reduce demand on engineering resources in the interim between promulgation of the rule and…
- Last published:
-
May records, regardless of whether they are paper or electronic, be stored off-site?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Refiners, oxygenate blenders and importers must indicate where records will be kept on all facility registrations.(7/1/94) This question and answer was originally posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994…
- Last published:
-
What is meant by "grandfathered" fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under the RFS2 regulations, renewable fuel produced from facilities that commenced construction before December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction and thereby exempt from the minimum 20% GHG…
- Last published:
-
Is the licensed professional engineer conducting the engineering review required to perform the site visit in person, or can they delegate the site visit to another person who maybe assisting them in the engineering review?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1450(b)(2), all verifications must be performed by the licensed professional engineer conducting the engineering review. This requirement includes conducting the site visits. The licensed professional engineer conducting the engineering review must perform the site visits to…
- Last published: