Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
-
Lead
Total results: 401
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 237
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Emergency Planning (EPCRA 301-303)
- Lead Abatement, Risk Assessment and Inspection
- 40 CFR Part 112.20 Facility Response Plans
Displaying 1 - 15 of 93 results
-
What is a reactive and non-reactive solid EHS?
Reactive solid means any extremely hazardous substance denoted with “a” in the “Notes” column in Appendix A or B of 40 CFR 355. Reactive solids are more likely than other solids to be dispersed into the air due to the energy or heat created from their reactivity with water or…
- Last published:
-
How did states form their SERCs?
How are States expected to form their State Emergency Response Commission (SERC) as required under Title III? States are required to establish a State Emergency Response Commission (SERC) under Title III. The SERC may consist of existing emergency response organizations or may be an entirely new mechanism to address this…
- Last published:
-
Pesticide applicator quantity applied to threshold or transportation exemption
A farmer contracts with an applicator to spray pesticides on his fields. The applicator drives a tank truck onto the farmers' field and sprays the pesticide from the truck onto the fields. For purposes of Section 302 emergency planning requirements, are the EHSs in the truck considered present at the…
- Last published:
-
State refusing to comply with the emergency planning provisions
What will happen if a State refuses to comply with the emergency planning provisions? A governor who does not designate a State emergency response commission becomes the commission by default. While the governor could choose not to fulfill any of the Title III provisions, the public could still request information…
- Last published:
-
Section 302 notification requirements and mixtures with unknown components
Are facilities exempt from Section 302 notification requirements if they produce, use, or store mixtures whose extremely hazardous substance component information is not available on the MSDS provided by the manufacturer? If the facility which produces, uses, or stores mixtures knows or reasonably should know the components of the mixture…
- Last published:
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
Where can I get more information or copies of the lead-based paint abatement application forms and instructions?
Answer: Information regarding certification under EPA’s lead-based paint abatement program is available at https://www.epa.gov/lead/lead-based-paint-abatement-and-evaluation-program-overview . Question Number: 23002-32438 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
When must I take refresher training?
You must take refresher training before you apply for recertification to EPA. You should begin looking for available courses well before your current certification expires, because refresher courses may not be available in your area on a frequent basis. However, EPA recommends that you take your refresher training no earlier…
- Last published:
-
When do persons applying for certification as inspectors, risk assessors, or supervisors apply to EPA, before or after taking the 3rd party exam?
Answer: Persons applying for certification as inspectors, risk assessors, and/or supervisors must apply to EPA before taking the 3rd party certification exam. For more information about applying for certification as a lead-based paint abatement professional please refer to EPA’s Lead-based Paint Professionals page . Question Number: 23002-33448 Find a printable…
- Last published:
-
When individuals apply for certification in the Federal program under 40 C.F.R. 745.226(a)(1)(i), how long will the certification last?
Answer : For individuals who have taken courses which included a course test and a hands-on skills assessment, the full certification period for individuals applying under 745.226(a)(1)(i) will run for three years from the date of issuance of certification by EPA. For individuals who have taken courses which included a…
- Last published:
-
The definition of “soil sample” at 40 CFR §745.63 relies on certain American Society of Testing Materials (ASTM) standards. Did EPA intend to prevent the use of EPA and HUD standards for soil samples?
Answer: No. In establishing work practice standards for lead-based paint activities, EPA did not intend to prevent the use of EPA/HUD standards. As a general matter, the requirements are not prescriptive but instead state that certain activities be conducted using appropriate documented methodologies. For example, §745.227(c)(3) requires that dust samples…
- Last published:
-
TPQ calculations for hazardous substances in molten form
Facilities are subject to emergency planning and notification requirements under EPCRA (also known as SARA Title III) when an extremely hazardous substance (EHS) is present at a facility in an amount equal to or in excess of its TPQ. For some EHSs that are solids, two TPQs are given (e.g…
- Last published:
-
Reporting responsibility under EPCRA §302 for a facility with several unrelated companies?
A public warehouse is used by several unrelated companies to store extremely hazardous substances (EHSs). For purposes of emergency planning notification, who is responsible, under EPCRA Section 302, for notifying the State Emergency Response Commission if a threshold planning quantity (TPQ) of an EHS is present at the warehouse? The…
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published: