Search Frequent Questions
Filter By:
- Emergency Planning and Community Right-to-Know Total results: 301
-
Lead
Total results: 398
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 237
- Testing for Lead Total results: 19
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 121 - 135 of 699 results
-
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity?
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity? Do I calculate the amount of painted surface disrupted using the standard for interior renovations (six square feet or…
- Last published:
-
What, if any, additional requirements or liabilities exist if a homeowner independently removes the protective barriers and containment measures implemented by the firm during a renovation?
Before a firm begins a renovation, they are required to comply with all information distribution requirements under the Lead Renovation, Repair and Painting (RRP) Rule and to post signs that clearly define the work area and warn occupants and other persons not involved in renovation activities to remain outside of…
- Last published:
-
Who is responsible for controlling dust and debris from renovation waste once the waste container or truck used to transport the waste leaves the renovation site?
When a renovation firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris. The Lead Renovation, Repair and Painting (RRP) Rule does not address the responsibilities of other entities. EPA recommends consulting with state and local waste disposal authorities to learn…
- Last published:
-
Who is affected by the Fee Rule for Lead Abatement and Renovation, Repair and Painting (RRP) Programs?
The Fee Rule for Lead Abatement and RRP Programs establishes fees that will be charged for training programs seeking accreditation, for firms engaged in renovations seeking certification and for individuals (for example, risk assessors) or firms engaged in lead-based paint activities that govern lead abatement, inspection and risk assessment activities…
- Last published:
-
Can a homeowner use an EPA-recognized lead test kit to check for lead-based paint?
Answer: A number of lead test kits are available for consumer purchase in most retail hardware stores; however, the Consumer Product Safety Commission (CPSC) states that consumers should exercise caution when using these lead test kits to evaluate consumer products for potential lead exposures. Find more information online . To…
- Last published:
-
How can I obtain D-Lead® test kits?
The D-Lead® test kits are available for purchase from certain distributors and retail outlets. Locate a distributor or retailer online , email [email protected] or call 414-962-3006. Question Number: 23002-16390 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Is lead paint testing required under the Lead Renovation, Repair and Painting (RRP) Rule?
No. A firm can either assume lead-based paint is present and follow the requirements of the RRP Rule (which requires no testing), or test and if lead-based paint is found follow the requirements of the regulation. Question Number: 23002-32338 Find a printable PDF copy of all frequent questions pertaining to…
- Last published:
-
When testing a work area, does one lead test kit or paint chip sample suffice for any single component?
The certified renovator is only required to use one lead test kit or paint chip sample for each component, even if the surface of the component is extensive (e.g., a large wall). Question Number: 23002-23865 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Applicability of EPCRA 311 and 312 to state and local government facilities
Are state and local government facilities subject to the Emergency Planning and Community Right-to-Know Act (EPCRA) Sections 311 and 312 in states with Occupational Safety and Health Administration (OSHA) approved state plans covering those facilities? The Occupational Safety and Health Act prohibits OSHA from covering state and local government workers…
- Last published:
-
Clean Water Act (CWA) and CERCLA Hazardous Substance Lists
What is the relationship between the hazardous substance lists under the Clean Water Act (CWA) and under CERCLA? All CWA hazardous substances and CWA toxic pollutants are CERCLA hazardous substances, whereas only some CERCLA hazardous substances are CWA hazardous substances. CERCLA section 101(14) defines “hazardous substance” by reference to lists…
- Last published:
-
Using TRI Form R for Continuous Release Reporting
A facility wants to use the reduced reporting option under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) section 103(f)(2) for releases of hazardous substances that occur in a manner that is continuous and are stable in quantity and rate. Can the Toxics Release Inventory (TRI) Form R be…
- Last published:
-
Eligibility for Gasoline and Diesel Thresholds at Retail Gas Stations
If a retail gas station is not fully compliant with applicable Underground Storage (UST) regulations for an underground diesel tank, but is compliant for all gasoline USTs, can it use the 75,000 gallon gasoline UST threshold when determining if a threshold has been exceeded for EPCRA sections 311 and 312…
- Last published:
-
Determining the amount released for Ammonia and Ammonium Hydroxide for Release Notification Requirements under CERCLA section 103 and EPCRA section 304
Ammonia (CAS number 7664-41-7) is an Extremely Hazardous Substance (EHS), listed at 40 CFR Part 355 Appendix A and Appendix B with a reportable quantity (RQ) of 100 lbs. Both ammonia and ammonium hydroxide (CAS number 1336-21-6) are listed as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) hazardous substances…
- Last published:
-
Tier2 Submit software and confidential chemical location information
When using EPA’s Tier2 Submit software to comply with the annual Hazardous Chemical Inventory reporting requirement under the Emergency Planning and Community Right-to-Know Act (EPCRA) §312, how can a person withhold confidential chemical location information from disclosure to the public? In order to fulfill the proper reporting under EPCRA, a…
- Last published:
-
EPCRA Release Notification of RQ in Any 24-Hour Period
EPCRA section 304 requires notification to the State Emergency Response Commission (SERC) and the Local Emergency Planning Committee (LEPC) when there is a release of a reportable quantity (RQ) of either a CERCLA hazardous substance or an extremely hazardous substance (EHS). CERCLA section 103(a) and 40 CFR 302.6 require notification…
- Last published: