Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 398
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Minor Repair and Maintenance Activities Total results: 14
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 20 results
-
Where can I find older NEI data (prior to 2008)?
The raw data and summaries that are still available (dating back to 1990) can be obtained from the web page https://www.epa.gov/air-emissions-inventories/pollutant-emissions-summary-files-earlier-neis . Starting with 2001 data, a more limited selection of summary files are available.
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity?
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity? Do I calculate the amount of painted surface disrupted using the standard for interior renovations (six square feet or…
- Last published:
-
Are biogenic emissions included in the emissions trends Tier 1 data?
No, the biogenic emissions are not included in the emissions trends Tier 1 data. If needed, users can add the biogenic data either as a separate Tier, or specify its inclusion in the “Miscellaneous” Tier 1 group.
- Last published:
-
My firm installs carpets. Sometimes there is no need to remove an existing carpet before installing the new carpet, but sometimes there is. How do I know when I need to comply with the Lead Renovation, Repair and Painting (RRP) Rule?
If when installing the carpet, you disrupt six square feet or less of painted surface per room, the job is not covered by the RRP Rule . Question Number: 23002-19749 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Please provide guidance on how the Agency will interpret the term “minor repair and maintenance activities.”
Answer: “Minor repair and maintenance” is defined in 40 CFR 745.83 as activities that disrupt less than 6 square feet or less of painted surface per room for interior activities or 20 square feet or less of painted surface for exterior activities where none of the work practices prohibited or…
- Last published:
-
Does the minor maintenance exception mean that if I drill one-inch holes in a painted surface to blow insulation into an enclosed wall cavity, I could drill 864 holes in the interior or 2880 holes on the exterior before I had to comply with the RRP Rule?
The exception is based on the area of paint disrupted, which in this example is based on the combined areas of the holes drilled in the wall. Question Number: 23002-15677 Find a printable PDF copy of all frequent questions pertaining to lead . Other Frequent Questions about the RRP Program…
- Last published:
-
In a multi-family building, does the standard for interiors of six square feet or less, or the standard for exteriors of 20 square feet or less of disrupted painted surface apply to the whole building or can it be applied to each separate unit?
For interiors, the exception for work that disrupts six square feet or less of painted surface applies to each individual room and is inclusive of all work done in the room in any 30-day period. For exteriors, to qualify for the exception for minor repair and maintenance activities, the total…
- Last published:
-
What sources make up the Sectors or Tiers used in the emissions data summaries?
Tier 1 and Sector categories are assigned by source classification codes (SCCs) that are the most specific processes available in the NEI. The latest SCC list with the Tier 1 and Sector assignments can be downloaded from the EPA SCC website in Comma Separate Values (CSV) format.
- Last published:
-
Where can I obtain the hourly data from Continuous Emissions Monitors (CEMs)?
The CEM emissions data are available from the EPA Clean Air Markets Program Data website.
- Last published:
-
Is replacing a pane of glass or fixing a broken window balancer a renovation covered by the RRP Rule?
It depends. Replacing a pane of glass or fixing a broken window balancer can disturb paint. If the job disrupts more than six square feet of painted surface per room, the job is not considered minor repair and maintenance and it is covered by the RRP Rule. When removing a…
- Last published:
-
Where can I get maps and/or emissions of facility emissions data?
The EPA provides emissions maps in two ways. First, each of the last three NEI years have a “Facility Mapping” tab available on the main NEI page for that inventory year (for example, see the 2020 NEI page). With this tool, maps can be created for one state at a…
- Last published:
-
How can I get more detailed information? What measurements/sensors are used to measure emissions?
Access the latest NEI data set . Under 'Sector Summaries - Criteria and Hazardous Air Pollutants by 60 EIS emission sectors', > choose National > for Pollutant, choose PM10 Primary and/ or PM2.5-PRI > Sector, choose all sectors >Submit Query to see results at bottom of page. Open the results…
- Last published: