Search Frequent Questions
Filter By:
- Radiation Total results: 1
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 398
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 11 of 11 results
-
Why is the sentence incomplete on page 34 In the section about collaboration?
Thank you for bringing this to our attention. It appears there was an issue converting the document to a PDF. The missing text will be reflected in a modification to the RFA which will be posted to grants.gov and the EPA's RFA website as soon as possible.
- Last published:
-
Why is Page 34 In the "data interpretation, statistical analysis and report writing, item (3) of effective plans" empty?
Thank you for bringing this to our attention. It appears there was an issue converting the document to a PDF. The missing text will be reflected in a modification to the RFA which will be posted to grants.gov and the EPA's RFA website as soon as possible.
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
PE certifying a technical amendment
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify all technical amendments to an existing SPCC Plan (§112.5(c)). When certifying a technical change to an existing SPCC Plan, does the PE have to inspect and certify the entire Plan or only the amended…
- Last published:
-
Is a PE required to review an SPCC Plan if it has not changed?
Under the 2002 regulations, is a PE required to review the SPCC Plans at the end of a 5-year SPCC Plan cycle if no changes have occurred at the facilities? No. It is the responsibility of the owner or operator to document the completion of a review and decide whether…
- Last published:
-
PE certifying an SPCC plan in a different state
Except as provided in 40 CFR §112.6 for qualified facilities, a licensed Professional Engineer (PE) must review and certify an SPCC Plan for it to be effective to satisfy the requirements of Part 112 (§112.3(d)). When reviewing and certifying a facility’s SPCC Plan, must the PE be licensed in the…
- Last published:
-
How did EPA amend the requirements for animal fats and vegetable oils in 2006?
In December 2006, EPA removed the following SPCC requirements for the following specific types of animal fat and vegetable oil facilities: Requirements for onshore oil production facilities (Section 112.13) Requirements for onshore oil drilling and workover facilities (Section 112.14) Requirements for offshore oil drilling, production, or workover facilities (Section 112.15)…
- Last published:
-
Rainwater in containment system of SPCC regulated farm
What do I do with rainwater that accumulates in my containment system for a farm regulated by the Spill Prevention, Control, and Countermeasure (SPCC) rule? Check the rainwater for any oil, and if no oil is present, this can be released. If there is oil in the water, this water…
- Last published: