Public Interest Waiver of American Iron and Steel Requirements for Projects Funded Through the Washington State Emergency Loan Program
Product specific project waivers apply only to the specified product and proposed project referenced in the waiver. Any other project that wishes to use a similar product must apply for a separate waiver based on specific project circumstances.