Florida Proposed Title V Permits
EPA is updating the Electronic Permitting System. Throughout the transition, permit actions will be uploaded to this page weekly beginning the week of 1/6/25 until the new public dashboard is available. The first table was last updated on 1/14/25. The second table stopped updating on 12/13/24. Please direct any questions to [email protected].
Facility Name | Permitting Authority | Permit Number | Title V Permit Action | Submission Category | Public Notice Period | End of EPA 45-day Review | Petition Period | Files |
---|---|---|---|---|---|---|---|---|
Florida Power and Light Smith Electric Generating Plant | Florida DEP | 0050014-040-AV | Renewal | Final Issued (1/9/2025) | 10/9/2024 – 11/8/2024 | 1/3/2025 | 1/4/2025 – 3/5/2025 | |
Florida Power and Light – Gulf Clean Energy Center | Florida DEP | 0330045-068-AV | Renewal | Final (issued 1/8/2025) | 10/14/2024 – 11/13/2024 | 12/30/2024 | 12/31/2024 – 3/3/2025 | |
Mosaic Fertilizer | Florida DEP | 1050046-091-AV | Significant Modification | Final (issued 12/13/2024) | 10/28/2024 – 11/27/2024 | 12/30/2024 | 12/31/2024 - 3/3/2025 | |
Okeelanta Sugar Refinery | Florida DEP | 990005-051-AV | Significant Modification | Draft | 12/26/2024 – 1/25/2025 | |||
Nutrien White Springs | Florida DEP | 0470002-139-AV | Significant Modification | Draft | 12/26/2024 – 1/25/2025 | |||
Seminole Generating Station | Florida DEP | 1070025-039-AV | Significant Modification | Final (issued 10/15/2024) | 6/6/2024 – 7/6/2024 | 10/29/2024 | 10/30/2024 – 12/30/2024 |
The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review. To find out which permits have been targeted for EPA Region 4 review, please contact the Region 4 staff person(s) listed at the bottom of this page.
Return to Region 4 Proposed Title V Permits and State Contacts
Instructions for Table: Scroll to the right to view the petition period and the associated files. Click on the title of any column to sort by that column. Users can also use the "Select Columns" button to change or narrow down what columns are displayed. Use the "Filter rows by text" box to search for specific key words. Click on the "View Files" button in the far right column to view the permit documents in the public docket.
For information about the contents of this page please contact Jacqueline Summers-Evans.
As of August 14, 2020, the table of permitting actions on this page is dynamically linked to EPA's national Electronic Permit System (EPS). Permitting actions appear in the table in real time as soon as they are entered into the EPS database, typically on a weekly basis.